Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Kissimmee, Florida. Completed plans call for the construction of a 159,000-square-foot, three-story above grade educational facility; for site work for a educational facility; and sidewalk / parking lot.
This document shall serve to provide interested parties with specific information as to the Procedures for Selection of a Construction Management Firm where the method of compensation is a Negotiated Fee on a Guaranteed Maximum Price. Pursuant to Chapter 1013, Florida Statutes, the Florida Consultant's Competitive Negotiation Act, Section 287.055 Florida Statutes, and Rule 6A-2.0010, Florida Administrative Code, the School District of Osceola County, Florida will consider the contracting of one (1) firm to provide construction management services for the project described below. In determining whether a firm is qualified, the School District of Osceola County, Florida shall consider such factors as supporting office location(s), experience and past performance, proposed project staff and functions, project approach, workload, scheduling methodology, and references. The new proposed school will be a Schenkel & Shultz Architecture K8 prototype for grades Kindergarten through Eighth grade and is being built to relieve Westside K8. The basis of this design will be a re-use of the 3-story, concrete tilt, K-8 School Prototype. The prototype school will accommodate the programs of the district resulting in approximately 159,000 GSF of new construction. The school will be situated on a 61+/- acre parcel. There are five wetlands on the property that total 18.2 acres although the architectural design will be such that little or no wetlands are impacted. The building will be designed with a high-performance envelope detailing to achieve SDOC's required criteria of 25 or less Energy Utilization Index (EUI) and 0.20 cfm (cubic foot per minute) per envelope square footage. The work will include the construction of a small mock-up structure (PE storage building) to facilitate high-performance testing. The project will also include an EHPA enhanced gymnasium building with seating for 500. Site Amenities shall include separate parent and bus loops with aluminum-covered canopies along with approximately 180 parking spaces. Parent queue will be able to double stack approximately 180 cars on site. Athletic amenities on-site shall include a 400-meter running track with a soccer infield and (2) full-size exterior basketball courts. The facility will be designed as Net Zero Ready so that in the future, photovoltaic arrays can be installed on the roof, and will serve as a redundant IT hub for the school district. Construction Documents: January 1, 2022- January 1, 2023 Construction Start: January 1, 2023 Substantial Completion: May 1, 2024 Final Completion: August 1, 2024 Anticipated Award Date 4/19/2022 The construction management firm will be responsible for the successful, timely, and economical completion of the Project. The construction management firm's services may include, but are not limited to the following: 1. Enter an "At-Risk" contract with all sub-contractors, materials suppliers, and equipment suppliers necessary for the construction of the project. 2. Employ competent Project Managers, Project Superintendents, and necessary assistants to be the Construction Manager's representatives, and who shall be in attendance at the project site full time during the progress of the Work. 3. New buildings will be constructed to meet the High-Performance Building Criteria to achieve an Energy Use Intensity (EUI) requirement of 25 or less and a building envelop Air Leakage (infiltration and exfiltration) maximum of 0.20 CFM/SF. 4. Provide preconstruction services as directed by the Owner's Project Representative during the design phases of the work, and provide cost estimating, schedule development, timely document review, existing infrastructure evaluation expertise, permit request and administration, and other related administrative items necessary to ensure the timely delivery of the project. 5. Work with the project team and use the Owner's Project Management Solution, e-Builder to manage the construction processes for the project. All project communication is to be managed in e-Builder. At no cost to the District, the project team will be required to attend group or individual training sessions scheduled by the Owner's Project Representative. 6. The Owner has set an Owner Direct Purchase Goal of 20% for Renovation Projects and 30% for New Construction. The Construction Manager is to make every effort to meet or exceed the Owner's expectation for this goal. The Construction Manager must also work with its subcontractors, sub-subcontractors, and material suppliers to ensure there is a streamlined process in place to maximize discounts offered for prompt payment of items purchased through the Owner Direct Purchase Program. 7. The Construction Manager, if requested by the Owner's Project Representative, shall provide a preliminary evaluation of the Owner's Project program and budget. 8. Provide continuous on-site construction management services through the completion of the project to include, but not be limited to: a. Schedule and conduct preconstruction meetings and regular job site meetings. b. Maintain daily on-site project logs and schedule reports. c. Oversee quality assurance testing and inspection programs. d. Monitor construction management staff and subcontractor work performance for deficiencies. e. Maintain record copy of all contract documents, RFIs, ASIs, change orders, and other project-related documentation. f. Oversee construction management staff and subcontractor safety programs. 9. Develop, update, and maintain master project schedules, detailed construction schedules, submittal schedules, inspection schedules, and occupancy schedules. 10. Provide construction program accounting and reporting to the Owner's Project Representative. 11. Report potential budget and schedule variances and prepare recovery plans. 12. Work with and coordinate activities with any third-party contracts or contractors that the Owner provides for the project. 13. Coordinate surveyors, special consultants, and testing lab services contracted by the Owner, as required. 14. Develop and administer a Warranty Implementation Plan. 15. Administer post-construction closeout, start-up, and transition to operation. 16. Schedule, coordinate and participate in a walk-through inspection of the Work one month prior to the expiration of the one-year correction period, and notify the Owner's Project Representative, the appropriate Architect, and any necessary subcontractors and suppliers of the date of, and request their participation in, the walk-through inspection. 17. Work with the architect of record and the Owner's Project Representative when submitting the various documents required for review, which includes but is not limited to Change Orders, Contingency Transfers, Buyout Transfers, Applications for Payment, and Certificates of Substantial Completion and Certificates of Final Inspection. 18. All meetings shall be documented in e-Builder using the appropriate Meeting Minutes Forms. The sign-in sheet, meeting minutes, and any other documents distributed during the meetings must be attached to the appropriate Meeting Minutes Form, and then uploaded to e-Builder after each meeting. The Construction Manager is responsible for facilitating the OAC meetings, distributing an agenda for each meeting, and managing a sign-in sheet. The Construction Manager is also responsible for making sure the meeting minutes are documented and uploaded to e-Builder using the appropriate Meeting Minutes Form. 19. Administer post-construction closeout, start-up, and transition to operation. 20. The Construction Manager shall cooperate at all times with the Owner's Project Representative and shall cooperate and coordinate with any auditing agency or audit firm contracted by the Owner. Question End Date 2/21/2022 12:00 PM
Award
Educational
$33,600,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2022
January 1, 2023
S Poinciana Blvd, Kissimmee, FL
Related To This Project
Kissimmee, FL
Bid Date: Apr 26 2022
Kissimmee, FL
--
Kissimmee, FL
Bid Date: Mar 21 2022
Kissimmee, FL
Bid Date: May 03 2022
Kissimmee, FL
--
Kissimmee, FL
--
Kissimmee, FL
Bid Date: Apr 19 2022
Kissimmee, FL
Bid Date: Jan 21 2022
Kissimmee, FL
Bid Date: Feb 18 2022
Kissimmee, FL
Bid Date: Apr 14 2022
Kissimmee, FL
--
Kissimmee, FL
Bid Date: Dec 01 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.