BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2022 at 7:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

The Bidder shall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: Replacement of concrete streets, sidewalk, curbs, ramps and all other items located with in the City's right of way all in accordance with the Bidding Documents as prepared by Right ol Way for the City of Fort Wayne, Indiana. The Bidder shall furnish all labour, insurance, equipment, materials and power for the complete performance of this project as follows: Replacement of concrete streets, sidewalk, curbs, ramps and all other items located with in the City's right of way all in accordance with the Bidding Documents as prepared by Right of Way for the City of Fort Wayne, Indiana. No bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City, upon any debt or contract, or, who has faille to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a DE ADVERTISEMENT for BIDS faulter as to surety or otherwise, upon any obligation to the City. No bid may be withdrawn after the scheduled time for receipt of bids for at least ninety (90) days to allow review of bids before announcing award of contract. The successful bidder may be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. EBE Goals - The City's goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount.

Bid Results

Roads / Highways

$91,595.00

Public - City

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
117
Bidding Soon
1,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

March 14, 2022

Project location map

Multiple Locations, Fort Wayne, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.