BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in American Fork, Utah. Completed plans call for the renovation of a municipal facility.

The purpose of this RFP is to enter into a contract to provide: Mechanical Upgrades at the East Transportation Building. The East Transportation Building has aging equipment and requires upgrades to the mechanical system. Question Submission Close Date - 2/4/2022 2:00 PM MST If you need more information on this event, please contact: Heath Mills hmills@alpinedistrict.org Pursuant to Utah Administrative Rule R33-12-502 the awarded contract(s) may be modified to incorporate new technology or technological upgrades associated with the procurement item being solicited, including new or upgraded: (i) systems; (ii) apparatuses; (iii) modules; (iv) components; and (v) other supplementary items. Further, a maintenance or service agreement associated with the procurement item under the resulting contract(s) may be modified to include any new technology or technological upgrades. Any contract modification incorporating new technology or technological upgrades will be specific to the procurement item being solicited and substantially within the scope of the original procurement or contract. Each proposal received shall be evaluated as outlined in this RFP and the Utah Procurement Code. To be responsive and responsible Offerors must review and respond to the following sections of this RFP: prerequisites, buyer attachments, and questions. The Prerequisites section includes the objective and subjective criteria that will be used to evaluate the proposals, which include the mandatory minimum requirements, technical criteria, and other prerequisites that Offerors must read and agree to in order to respond to this RFP. The Buyer Attachments section includes the standard contractual terms and conditions of this RFP and other documents required for this RFP. The Questions section allows the District to ask Offerors questions regarding this RFP. Offerors must review each section carefully. To determine which proposal provides the best value to the conducting procurement unit, the evaluation committee shall evaluate each responsive and responsible proposal that has not been disqualified from consideration under the provisions of Part 7 of Utah Code 63G-6a, using the criteria described in this RFP. After the evaluation and final scoring of proposals is completed, the District shall award the contract as soon as practicable (subject to the requirements of Utah Code Section 63G-6a-707(10) to the eligible responsive and responsible Offeror, subject to Utah Code Section 63G-6a-707(10), provided the RFP is not canceled in accordance with Utah Code Section 63G-6a-902. The District reserves the right to conduct discussions with the Offerors who submit proposals determined to be reasonably susceptible of being selected for award, followed by an opportunity to make best and final offers pursuant to UCA 63G-6a-707.5, but proposals may be accepted without discussions. It is the intent that this construction shall start as soon as possible and be completed on or before June 1st , 2022. The work to be done under this section includes the furnishing of all labor, materials, equipment, controls and accessories required to complete all heating, air conditioning, ventilating, plumbing, drainage, and other mechanical systems as shown on plans and/or described in these specifications, including miscellaneous items required to provide complete and functional systems. Work shall include, but shall not be necessarily limited to, the following: Testing Balancing Insulation systems Plumbing system Air distribution systems Packaged DX/gas fired rooftop unit Make-up air unit with evaporative cooling Building automation system Special systems The mechanical contractor shall provide all miscellaneous electrical work and control wiring for special systems where the wiring requirements are provided by the equipment manufacturers and/or suppliers, unless all of the required wiring is clearly shown on the electrical drawings to be provided by the electrical contractor.

Post-Bid

Municipal

$300,000.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
31
Bidding Soon
528
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 10, 2022

img_map_placeholder

1405 S 100 E,, American Fork, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.