BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Pasadena, California. Completed plans call for the renovation of a fire / police facility.

As of March 22,2022. This project has not yet been awarded. A timeline for award has not yet been established. Bid Bond 5.00% The City of Pasadena ("City") will select a single qualified Contractor to perform improvements and seismic retrofit to Fire Station 38 including renovations to the kitchen, living room, locker room, restrooms, offices, storage area, and public counter, as well as voluntary seismic retrofit based on ASCE 41-17 standards (the "Project"). The Work includes, but is not limited to, demolition of walls and partitions to accommodate new floor plan layout; removal and replacement of flooring, tile, ceiling, lighting, fixtures, furniture, appliances, and equipment; installation of new fire detection devices, window treatments, cabinetry and doors; re-roofing; providing new mechanical, electrical, and plumbing; performing hazardous materials abatement; foundation strengthening at wood shear walls; wood shear wall strengthening; wood diaphragm strengthening; and seismic bracing of higher-risk non-structural components in the building. Questions due by: Thursday, February 17, 2022 at 2:00 p.m. Tiffiny Chen E-mail: tchen@cityofpasadena.net (all RFIs must be submitted e-mail) The scope of work includes all work described in this spec and also what is shown in the construction documents, but is not limited to the following: 1. Renovation of existing Restroom and Shower Rooms w/ new finishes & plumbing fixtures. 2. Renovation of existing Locker Room w/ new finishes, and new custom lockers. 3. Renovation of existing Kitchen Rooms w/ new cabinetry/countertops, and new appliances. 4. Renovation of existing selected Office Rooms. 5. Renovation of existing Janitor/Laundry Rooms. 6. Renovation of existing Living Rooms. 7. Renovation of existing Accessory Storage Room. 8. Renovation of areas adjacent to the above rooms. 9. New seismic retrofit to include new shear walls, new foundation footing, new blockings etc. 10. Selected door replacement. 11. New weather seals and door hardware. 12. Replacement of existing windows. 13. New windows & sliding door roller shades. 14. Replacement of roofing system & rain gutters. 15. Replacement of HVAC systems and equipment curbs. 16. New exhaust fans. 17. New Solar Tubes. 18. New light fixtures. 19. New Gyp board over existing and new wood framing at walls and ceilings. 20. New R-15 insulation. 21. New R-30 insulation. 22. New polishing finish of existing concrete. 23. New exterior metal ladder w/ secure door, post pulley, and portable winch. 24. New plywood for walking around mechanical equipment. 25. Provide and install all electrical power, conduits, pull boxes, devices, relays, circuit breakers, and new generator 26. Fully cooperate with all City agencies and other Contractors under contract to the City and assigned to this project. 27. Contractor to obtain building permits from the City's Building Department. Plans are already check and approved by the Building Department. 28. Install electrical power and water connections for all contractors use. Provide and install one chemical toilet, fencing with green screening around the construction site and dumpster/laydown area (if needed, with prior approval of location from City Engineer). 29. The contractor is responsible to familiarize themselves with the existing utilities and electronic systems inside and outside the Fire Station to facilitate their work on this project. 30. The contractor is responsible for providing all required insurance, bonds, schedule of values, construction schedules, monthly updated schedules, attending weekly Owner, Architect, Contractor meetings, submitting monthly invoices, certified payrolls, three sets of closeout binders. 31. Contractor shall maintain during construction and provide final as-built drawings at completion of project

Bid Results

Fire / Police

$1,398,888.00

Public - City

Renovation

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
95
Bidding Soon
2,210
All Active Projects
982
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

May 2, 2022

img_map_placeholder

1150 Linda Vista Ave, Pasadena, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.