BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Boulder Junction, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnish and deliver all materials, and to do and perform all work for the improvement of the project designated in accordance with the proposal requirements, conditions, and specifications . This project is part of LRIP CHID- Supplemental program. The county reserves the right to reject any and all bids, or to accept the bid which is most advantageous to the county. The county reserves the right to add or delete projects/bid items from the bid to maintain their budget. Prevailing Wage Law. This project does not fall under the prevailing wage rate requirements. Contractor to give a two week notice when ready to start the project. Project must be completed no later than September 1, 2022. Failure to complete project on time will result in a $500 per day penalty per day of delay. Contractor will be given a chance to explain delays of the project. The penalty may be waived for extenuating circumstances. Contractor and Highway Commissioner will meet to discuss any delays in the completion of the project Scope of work CTH M - The work under this contract consists of adding 2" CABC to assist with pulverization of the existing roadway, shaping, final grading and compacting of existing roadway, placement of 4" X 30' of compacted hot mix asphalt surface, hauling and placing of a 4" X 5' gravel shoulder. This project begins at CTH N and proceeds north for 5.4 miles north to CTH K and includes the CTH K intersection. This section is approximately 28,512' in length. The work shall be executed under the requirements of the State of Wisconsin, Department of Transportation, Standard Specifications for Road and Bridge Construction, most current edition and according to the current year State of Wisconsin supplemental specifications and the special provisions attached. It is required that the contractor review the road and work to be completed with the Highway Commissioner or his designee so both parties have a clear understanding of the work to be completed under this proposal

Post-Bid

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
79
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

March 17, 2022

img_map_placeholder

Co Rd M, Boulder Junction, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.