BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marine Corps Air Station Cherry Point, North Carolina. Working plans call for site work for a water / sewer project.

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information Public Works Project No.: 7155759 Title: Repair Multiple Drainage Issues with Flightline NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $36.5 Million Contract Completion Date: All work shall be completed within 270 calendar days after award. Estimated Cost Range: Between $100,000 and $250,000 Wage Determination: General Decision Number: NC20220065 01/07/2022 Liquidated Damages: $71.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled Monday, 31 January 2022 at 0830. Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. Specific Directions for this RFP: All contractors are required to complete the supplementary instructions to offerors form and submit it with their proposal. If this is not completed and submitted with the proposal their proposal will be considered non-responsive. Requests for Information (RFIs): RFIs must be submitted to linda.b.clark14.civ@us.navy.mil as well as ericka.j.bishop.civ@us.navy.mil. The cut off for RFIs is 13 February 2022 by 0900 in order to process all inquiries by the proposal due date. The specifications and drawings are posted as attachments at WWW.SAM.GOV. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$250,000.00

Public - Federal

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
20
Bidding Soon
349
All Active Projects
150
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 25, 2022

img_map_placeholder

Multiple Locations, Marine Corps Air Station Cherry Point, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.