Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a library in Chapel Hill, North Carolina. Design plans call for the renovation of a 317,529-square-foot library.
As of June 6, 2023, an architect has been awarded and this project is in the design phase. A contractor bidding timeline has not yet been disclosed. A construction timeline has not yet been confirmed, but is anticipated to begin late 2023, early 2025. *The closed solicitation has been included below for reference: This project scope of work includes the design of infrastructure upgrades to the Louis Round Wilson Special Collections Library (Wilson Library). Wilson Library is a 317,529 GSF building originally constructed in 1929, with subsequent additions constructed in 1953 and 1977. The infrastructure upgrades are to involve code compliant vertical circulation, accessibility modifications and the installation of new mechanical and fire protection systems within 1953 and 1977 portions of the facility. There will be an initial Advanced Planning design phase in compliance with the State of North Carolina Performance Standards for Sustainable, Energy Efficient Buildings. In addition, the Advanced Planning design phase will examine long term conceptual planning for the Library at a high level to ensure that appropriate strategies are being pursued as part of the infrastructure upgrades project. The goal being to not hinder future programming or potential re-configurations. The University will then contract with the design firm for the defined scope of work to provide: Schematic Design, Design Development, and Construction Documentation, including Life-cycle Cost Analysis at each design phase; Construction Cost Estimation; Phasing Plans (as may be necessary); and Construction Administration services. Design Services shall include: Architecture, Structural, Mechanical, Electrical, Plumbing, Fire Protection, and Abatement Design. Library planning experience via the team lead or direct consultant is also preferred. The method of contractor selection has not been determined at this time.
Design
Library
$31,185,830.00
Public - State/Provincial
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2024
200 South Rd, Chapel Hill, NC
Related To This Project
Chapel Hill, NC
--
Chapel Hill, NC
Bid Date: Dec 19 2022
Chapel Hill, NC
Bid Date: Jun 07 2022
Chapel Hill, NC
Bid Date: Sep 06 2022
Chapel Hill, NC
Bid Date: Aug 18 2022
Chapel Hill, NC
Bid Date: Aug 18 2022
Chapel Hill, NC
--
Chapel Hill, NC
--
Chapel Hill, NC
--
Chapel Hill, NC
--
Chapel Hill, NC
--
Chapel Hill, NC
Bid Date: Jul 01 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.