BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Coral Springs, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Owner, without invalidating the Agreement, may order changes in the work which do not materially alter the scope and character of the work of the Agreement or the completion date. All such changes in the work shall be authorized by a Change Order. Any individual Change Order which decreases the cost of the work to OWNER or increases the cost of the work by an amount not in excess of forty-five thousand and xx/100 dollars ($45,000.00) must be authorized and approved by Owner's Purchasing Manager prior to their issuance. Such authorization for Change Order approvals has a cumulative limit of twenty percent (20%) of the original contract award amount. Any individual Change Order which increases the cost of the work to OWNER by an amount which exceeds forty-five thousand and xx/100 dollars ($45,000.00), or any Change Order submitted for approval after the cumulative twenty percent (20%) limit has been reached, must be formally authorized and approved by the OWNER'S Commission prior to their issuance and before work may begin. No claim against OWNER for extra work in furtherance of such Change Order shall be allowed unless prior approval has been obtained. If Owner and Contractor are unable to agree as to the extent, if any, of an increase or decrease in the Contract Price or an extension or shortening of the Contract Time that should be allowed as a result of a Work Directive Change, a claim may be made therefor as provided in Article 10 or Article 11. Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented except in the case of an emergency and except in the case of uncovering Work as those situations are addressed herein. The estimated budget for this project is: $50,000.00

Post-Bid

Sidewalks / Parking Lot

$50,000.00

Public - City

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
48
Bidding Soon
1,138
All Active Projects
505
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

April 1, 2022

img_map_placeholder

Sample Rd, Coral Springs, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.