Site work and new construction of a power facility in Medicine Hat, Alberta. Conceptual plans call for the construction of a power facility.
Plans may result in the construction of a carbon capture plant that uses post-combustion, amine CO2 capture technology or other possible proven technologies to capture CO2 emissions originating during operations. The City has two power plant sites located 7 kilometers apart. The main power plant is located on Hwy 1 and the TransCanada bridge over the sought Saskatchewan River which has two LM60000PD units (units 14 and 15) with HRSG's and two LM2500 DLE units (units 10 and 11) with HRSG's along with two 33MW GE steam turbines. The steam turbines are also supplemented by a 150,000 lb/hr 900 psig gas fired Power Boilder along with duct firing on al HRSG's. Total MW output of the main plant is 137.4 MW on Gas Turbines alone and a total of 203 MWs with the Steam Turbines. The north-side power station (remote plant) is comprised of two LM6000 PF units (41.5MWs each) these are both simple cycle units and are named Unit 16 and Unit 17 (currently under construction and scheduled to come online at the end of March 2022). Unit 17 has an SCR system for removing NOx as well as 4MWe heat recovery unit for heating incoming combustion air on both units. Total MW output of all City of Medicine Hat assets will be 286MW's. TIMELINE: A pre-Feed study has been completed. The project has received $5 million from Natural Resources Canada to continue with Front-End-Engineering Design study (FEED). At this time, Imperial Oil Ltd. has been approved to take over the Carbon Sequestration Evaluation Agreement (CSEA) and undertake feasibility work to determine whether the geology is appropriate for permanent CO2 storage. Further details and project schedules may be confirmed mid-/late 2025. *Cost for the initial evaluation phase of the project is approx. $13M.
Conceptual
Power Plant
$13,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2026
To Be Determined, Medicine Hat, AB
Related To This Project
Medicine Hat, AB
Bid Date: Apr 14 2022
Medicine Hat, AB
Bid Date: May 26 2022
Medicine Hat, AB
Bid Date: May 27 2022
Medicine Hat, AB
Bid Date: May 31 2022
Medicine Hat, AB
Bid Date: Jun 02 2022
Medicine Hat, AB
Bid Date: Nov 09 2023
Medicine Hat, AB
Bid Date: Jun 07 2022
Medicine Hat, AB
Bid Date: May 04 2022
Medicine Hat, AB
Bid Date: May 17 2022
Medicine Hat, AB
Bid Date: Mar 22 2022
Medicine Hat, AB
Bid Date: May 12 2022
Medicine Hat, AB
Bid Date: Apr 01 2021
Medicine Hat, AB
Bid Date: May 05 2022
Medicine Hat, AB
Bid Date: Apr 12 2022
Medicine Hat, AB
Bid Date: Apr 28 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.