Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Milwaukee, Wisconsin. Working plans call for the renovation of a municipal facility.
As of 02/17/2022 They received zero bids. They believe they will soon reach out to a few roof companies to see why they didn’t bid, if needed change the scope and put it back out for bids. Furnish labor, material and services necessary to determine source of leaks, and repair, 2(TM) floor roof at Arlington Court Development, 1633 North Arlington Place. Note: Contractor shall perform work in accordance with all lead and asbestos removing procedures including, but not limited to, the containment and removal of materials on the ground. Contractor shall provide a dumpster for the containment of debris at commencement of project. Bagging is not acceptable. Contractor will be responsible for any damages done to lawn, or to neighbor's property. Site should be cleaned up DAILY. Storage of materials on site is not allowed. Contractor is responsible for providing a power source. Overall job is to be professional and done in a workmanlike manner. Contractor will be held liable for any damage caused to the building and ancillary structure, and/or injury to the occupants resulting from the execution of the work or from not exercising proper precautionary protective measures. Any cost of repair/replacement resulting from damages shall be at the contractor's expense. If this bid is over $2,000.00 you will be required to pay your employees per Davis Bacon Wage Determination W1I20220001, Modification Number 0, Effective January 7, 2022. Payrolls must be submitted electronically before payment will be processed. (See attached Certified Payroll Electronic Submission). In addition, the Contractor and its subcontractors shall provide all required compliance data with respect to any applicable Section 3 requirements to the HACM via the same electronic system. The Contractor and its subcontractors shall be responsible for responding to any requests for data or information by the noted response due dates, and shall check the electronic system on a regular basis to manage contact information and contract records. The Contractor shall also be responsible for ensuring that all subcontractors have completed all requested items with complete and accurate information and that their contact information is current. The Purchasing Division may determine the award of a tie bid using a method of chance. Tie bids are defined as all things being equal, such as price, quality, services, etc. Work shall commence within 3 business days ofaward of contract. Work shall be completed within 2 weeks ofstart date, weather permitting
Final Planning
Municipal
$150,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2022
August 17, 2022
1633 N Arlington Pl, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Aug 06 2021
Milwaukee, WI
Bid Date: Oct 08 2021
Milwaukee, WI
Bid Date: Oct 18 2021
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Aug 06 2021
Milwaukee, WI
Bid Date: Apr 07 2021
Milwaukee, WI
Bid Date: Jan 05 2022
Milwaukee, WI
Bid Date: Aug 06 2021
Milwaukee, WI
Bid Date: Apr 08 2022
Milwaukee, WI
Bid Date: May 06 2022
Milwaukee, WI
Bid Date: May 25 2022
Milwaukee, WI
Bid Date: May 06 2022
Milwaukee, WI
Bid Date: Jun 02 2022
Milwaukee, WI
Bid Date: Apr 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.