BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Somers, Wisconsin. Completed plans call for the renovation of a educational facility.

Fire Door Replacement. In general the work consists of the replacement of 33 fire rated doors within the exit stair enclosures. Along with this replacement will be minor removal and replacement of adjacent ceilings. The construction of a new fire rated wall above the ceiling to the concrete deck above. Electrical work will include the removal and replacement of magnetic hold-open devices and fire alarm components.

Under Construction

Educational

$572,600.00

Public - State/Provincial

Renovation

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
4
Bidding Soon
2,355
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

April 4, 2022

Project location map

University Dr, Somers, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.