BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Sequim, Washington. Completed plans call for site work for a road / highway.

Prequalified contractors are invited to submit a sealed bid for Clallam County PUD No, 1, transmission pole replacement with distribution, fiber optics, and communication attachments from Cherry Street to Race Street, Port Angeles, WA, A preliminary Project Plan and Schedule is requested to be submitted with the bid. The Engineer's estimate for the work under this contract is $318,780. Please contact Ben Phillips, Project Manager. Clallam County PUD No. 1, at 360-565-3267, or by email at bphillips@clallampud. net to advise the District of your attendance or if you have questions. Please no more than 2 people per party, full mouth and nose mask covering is required, and distancing of at least 6 feet separation will be in place. Each bid must be accompanied by a Bid Bond, Certified Check, or Cashier's Check in an amount equal to five percent (5%) of the Bid. Transmission pole replacement with distribution and fiber from South Cherry Street, along Lauridsen Boulevard, ending (2) poles east of Race Street, Port Angeles, WA. REMOVE Remove (21) single pole 69KV wood transmission poles, all of which have 3-phase distribution under build and PUD fiber communications. Remove approximately 5,835 feet of existing 3-Phase 4/0 ACSR with 4/0 neutral Remove (2) 12.5KV hook-stick distribution switches INSTALL CLALLAM PUD Install (21) single pole 115KV transmission fiberglass poles, all will have 3-phase distribution under build and PUD communications fiber. Cut-down (1) existing single pole 115KV transmission wood pole and install new distribution arm Transfer approximately 5,835 feet of 795AAC transmission conductor. This conductor will be de-energized Install approximately 5,835 feet of 556AAC 12.5KV 3-Phase distribution conductor. This conductor can be de-energized with switching Install (2) 12.5KV hook-stick 3-phase distribution switches Project materials to be supplied by the District TRANSFER CITY of PORT ANGELES Transfer of City of Port Angeles 69KV transmission on (1) pole. This circuit can be deenergized Transfer of City of Port Angeles 12.5KV 3-phase distribution on (2) poles. These circuits can be de-energized

Bid Results

Roads / Highways

$283,990.00

Public - County

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
55
Bidding Soon
1,140
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

May 2, 2022

img_map_placeholder

Multiple Locations, Sequim, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.