BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Renton, Washington. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; and playground / park / athletic field.

As of October 2022, construction is underway and expected to be completed in early Summer of 2023, however, an exact timeline for construction has not been confirmed. *** One addendum has been released as of 2/10*** Project no- 20-008 The work, to be substantially completed from the date of commencement under this contract, but shall not exceed a Substantial Completion date of March 3, 2023. shall include, but not be limited to: Construction of a singlespan steel bridge and related site work. All In-Water Work will comply with the schedule and requirements of the WA Department of Fishieries and Wildlife and other regulatory agencies as required. Work includes site mobilization, traffic control, site and environmental control, demolition and removal of existing bridge and pilings, earthwork, construction of single-span steel bridge and all components and structures, utility installation, landscape planting, and landscape irrigation and other improvements for the construction of Gene Conlon Memorial Park Trestle Bridge Replacement, including the repairs to the Gene Conlon Memorial Park Rose Wall for the City of Renton, Washington, all as shown and described in the Contract Documents prepared by WSP, USA, Inc Please direct questions regarding this project to the Citv, attn: Alan J. Wyatt, RLA, ASLA. LEED-AP; Capital Projects Manager, Parks Planning and onwa.gov. Document clarification questions must be submitted in writing no later than February 10, 2022, 5:00 PM PST, Federally Funded Project: Federal funding of Department of Interior Land & Water Conservation Fund administered through the Washington State Recreation and Conservation Office: Federal Agency: US Department of Interior Catalog of Federal Domestic Assistance Number and Name: 15.916- Land & Water Conservation Fund Federal Award Identification No.: P21AP12310 Total Federal Award: $500,000.00 Federal Award Project Description; 53-00756 Gene Conlon Beach Percentage Dollar Amount Source of Funding RCFB - Land and Water Conservation 33.34% $500,000.00 Federal Proiect Sponsor 66.66% $999,572,00 Total Grant Project Cost 100.00% $1,499,572.00 The City's fair practices/nondiscrimination policies and the State of Washington prevailing wage rates are applicable for this public works project located in King County. Bidders are responsible to verify and use the most recent prevailing wage rates. The "Effective Date" for this project is the Bid Form due date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website located. A Bid Bond in the amount of 5% of the total amount of the bid must accompany each bid. The City reserves the right to reject any and all bids and to waive any informalities or irregularities in bids received. The City's Fair Practices and Non-Discrimination policies and State Prevailing Wage Rates apply to this project. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders. Bidders may contact the Department ofLabor & Industries, Apprenticeship Section, to obtain. information on available apprenticeship programs. Bids shall be in a sealed envelope marked "GENE COULON MEMORIAL. PARK TRESTLE BRIDGE REPLACEMENT". onstruction of the replacement of the existing timber trestle bridge with a single-span steel structure and grating, and associated site work. Work includes earthwork, utility installation, demolition of existing timber trestle bridge and timber pilings, replacement of existing timber abutments with concrete abutments, placement of a new clear span bridge composed of concrete-covered steel girders with fascia panels and new railing, light penetrating grating and concrete panel decking, an overlook structure, landscape planting, landscape irrigation and other improvements for the construction of Coulon Memorial Park Trestle Bridge Replacement Purchased Goods - 8% MBE 4% WBE Purchased Services -10% MBE 4% WBE Professional Services - 10% MBE 4% WBE *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Bridges / Tunnels

$1,625,000.00

Public - City

Demolition, New Construction, Paving, Site Work

45

16

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
82
Bidding Soon
2,243
All Active Projects
666
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 17, 2022

October 3, 2022

August 7, 2023

img_map_placeholder

1201 Lake Washington Blvd N, Renton, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.