BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 15, 2022 at 8:00 PM

Updated November 14, 2023

Site work and paving for a road / highway in Spanaway, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Pavement repair, removing monument case and cover, planning bituminous pavement, constructing bridge approach slab, traffic barrier, geosynthetic wall F-shape traffic barrier on the US 101 eastbound to northbound I-5 ramp structure, paving with hot mix asphalt, delineation, pavement marking, permanent signing, traffic control and other work. Estimated value $1,250,000 - $1,500,000 Contact Kyler Kokenge Project Engineer OR21C508@wsdot.wa.gov WSDOT - US 101, Delphi Rd To I-5 Paving and Concrete Barrier *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,602,396.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
110
Bidding Soon
1,499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

May 2, 2022

Project location map

WA-7, Spanaway, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.