BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Totowa, New Jersey. Completed plans call for site work for a water / sewer project.

Replacement of Caustic Soda Piping at the Little Falls Treatment Plant Each submission shall be provided on the standardized forms as supplied in the submission package and the said standardized forms shall not be modified or altered in any way. Bidders shall comply with the requirements of the Local Public Contracts Law N.J.S.A. 40A:11-1 et. seq. as supplemented and amended; Disclosure Notice (P.L. 1977, c 33) N.J.S.A. 52:24.1 and Affirmative Action Requirements. (P.L. 1975 c 127) N.J.S.A. 10:5-32 in addition to other applicable State Laws. The Contractor shall submit any questions regarding the bid documents by Thursday, February 17, 2022 at 3:00 P.M. to the project representative listed in the bid documents. The successful bidder for the Contract shall be required to comply with the prevailing local minimum wage rates as determined by the New Jersey Department of Labor. Within the parameters established by the governing law, the Commission reserves the right to reject any and all bids or to waive any minor informalities or irregularities in the Proposal received and to award the contract to the lowest responsible bidder. The period of the Contract shall be three hundred sixty five (365) consecutive calendar days A. This work consists of the dismantling and removal of caustic soda discharge piping. New caustic soda piping shall be installed in accordance with PVWC's specifications. Work shall include the installation of a bypass on the water supply line, furnishing and installing instrumentation and required minor electrical work. B. The Contractor shall be fully and exclusively responsible for means, methods, techniques of construction, and safety. C. Contractor shall provide all labor, materials and equipment necessary to perform the Work, including, but not limited to, pipe, fittings, valves, couplings, adapters. D. The summary of the workas described in this Section is an overallsummary of the responsibilities of the Contractor and his relation to the Owner. It does not supersede the specific requirements of the specification sections. E. In addition to the project requirements described in the Description of Work, all costs for work described hereinabove shall be all-inclusive and shall be included in the prices bid The Commission is soliciting bids, all as indicated specified or required by the Bidding Documents or which can be reasonably inferred therefrom. The Bidding Documents describe these goods and services in greater detail. The duration of the Contract shall be as indicated in the Bidding Documents.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
500
Active Projects
234
Bidding Soon
4,591
All Active Projects
2,120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.