EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 14, 2022 at 7:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Wauconda, Illinois. Completed plans call for the renovation of a educational facility; for site work for a playground / park / athletic field; road / highway; and for paving for a road / highway.

Lump Sum Bid Proposals will be received at the scheduled time of receipt of bids and will be publicly opened at that time for Bid Release #1. The Trade Packages included are: Trade Package 6a: General Trades Trade Package 26a: Electrical Work, A/V and Fire Alarm Work Trade Package 31a: Grading, Concrete and Site Utilities Trade Package 32a: Playground Installation at Cotton Creek School Trade Package 32b: Asphalt Paving Bid security, in the form of a bid bond, certified check or cash in an amount equal to 10 percent of the base bid amount, shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Board of Education, Wauconda Community Unit School District 118. The Board of Education reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the District. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidders must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. The successful bidder will be required to furnish insurance equal to or greater than the specified amounts and conditions. The cost of the insurance will be included in each bidder's proposal. Successful bidders will be required to furnish 100% Performance and Payment bonds to Wauconda CUSD 118 and include a Dual Obligee Rider adding IHC Construction Companies, LLC. The cost of the performance and payment bond will be included in each bidder's proposal. Questions should be addressed in writing via email to IHC Construction Companies, LLC; Attn: Diane Papenhause, dpapenhause@ihcconstruction. com and Megan Morris, mmorris@ihcconstruction.com Questions submitted less than one week prior to the bid opening cannot be considered. Locations- Cotton Creek School Wauconda Grade School Matthews Middle School Wauconda Middle School Wauconda High School Transportation Center The Project consists of the alteration of the following locations. 1. Alterations at Wauconda Grade School include: a. Removal and replacement of two exterior doors. b. Milling and overlaying of asphalt paving. 2. Alterations at Cotton Creek School include: a. Creating a playground for the WEE Kids program. 3. Alterations at Wauconda Middle School include: a. Railing improvements at two interior stairs. 4. Alterations at Matthews Middle School include: a. Exterior concrete paving. 5. Alterations at Wauconda High School include: a. Refinishing of the competition gym wood floor. b. Adding exit signs and fire alarm devices in various locations. c. Adding exhaust fans in two washroom areas. d. Interior door modification. 6. Alternations at the Transportation Center include: a. Exterior wall repairs. b. Adding an interior storage mezzanine. . The start date for this project is June 2nd, 2022. The Substantial Completion Date is July 30th, 2022. Final Cleaning will also be completed by all contractors by July 30th. Final completion date, including completion of all punch lists, is August 12th, 2022

Post-Bid

Educational

$500,000.00

Public - County

Paving, Renovation, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Fabricator Qualifications, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Steel Floor Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Wall Finishes, Stone Facing, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
173
Bidding Soon
2,678
All Active Projects
1,194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

June 2, 2022

img_map_placeholder

Multiple Locations, Wauconda, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wauconda Community Unit School District 118 - 2022 Capital Projects Bid Release #1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.