BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 21, 2022 at 8:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Fond du Lac, Wisconsin. Completed plans call for paving for a road / highway; for site work for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Utility and Street reconstruction to include storm, sanitary, water installation, paving, restoration, concrete, water main boring, and other related items Pre-Qualification:Yes complete same by October 25, 2022 in accordance with said specifications. The Contractor shall perform everything required to be performed, and shall provide and furnish labor, materials, tool, expendable equipment, and all utility and transportation services required to perform and compete in a workmanlike manner, all of the work required and contemplated by this Contract for the City of Fond du Lac's "2022 UTILITY & STREET CONSTRUCTION" all in strict accordance with the Contract and Specifications, and Special Provisions, the same, together with the Contractor's Proposal and Bidding Schedule to be considered and made a part of this Contract. The work to be completed under this contract consists of street and/or utility reconstruction which may include sanitary sewer main and laterals, water main and services, storm sewer main and laterals, curb and gutter, pavement, street lighting, lawn restoration, and any other items necessary to complete the work as shown on the plans. The following list indicates the limits of construction: S. Bell Street from Bragg Street to Forest Avenue N. Butler Street from Russell Street to Portage Street S. Butler Street from Forest Avenue to W. Division Street Grove Street from Hillcrest Lane to S. Seymour Street E. 2nd Street from Vincent Street to Deneveu Creek E. Division Street from 200 ft west of to 200 ft east of Bridge over Deneveu Creek 8 th Street from Ellis Street to S. Park Avenue

Bid Results

Roads / Highways

$2,826,687.00

Public - City

Paving, Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
134
Bidding Soon
1,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

March 28, 2022

Project location map

Multiple Locations, Fond du Lac, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.