Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2022 at 8:00 PM

Updated February 14, 2024

Site work and renovation of a water / sewer project in Warrenton, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The BASE BID work, in general, consists of the preparation for and painting the interior and exterior of one (1) 400,000-gallon legged elevated potable water storage tank located in the Industrial Park, south of the intersection of Spoede Lane and Missouri State Highway M. The work includes installation of containment curtain, removal and disposal of existing interior and exterior coatings, replacement of interior and exterior coating, graphics, removal of containment and clean-up. Bid Security in the amount of five (5) percent of the Base Bid amount must accompany the Bid as stated in the Instructions to Bidder. No bid may be withdrawn within ninety (90) days after the scheduled time of receipt of bids. The City of Warrenton reserves the right to reject any and all bids, to waive irregularities in the bids and to determine the lowest and best bid This project is a prevailing wage project and will conform to the Missouri Department of Labor and Industrial Relations' Division of Labor Standards, Annual Wage Order No. 28. The Annual Wage Order contains prevailing wage rates for each occupational title in Warren County. The prevailing wage is the minimum rate that must be paid to workers on public works construction projects in Missouri.

Award

Water / Sewer

$361,700.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
100
Bidding Soon
1,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2022

March 30, 2022

Project location map

To Be Determined, Warrenton, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed