BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in El Paso, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

BASE BID I: Street, drainage, and landscape improvements are proposed for approximately 2200-feet of Edna Avenue from Alicia Drive to Huerta Drive. Construction improvements under this phase of construction include the demolition of concrete, pavement, curb, trees, adjustment to existing vehicular gates, and upgrade of existing street signage. Proposed street improvements will include excavation of roadway and drainage improvements, and the installation of 2" HMAC/8" Base Coarse/8" Select Fill; 6" standard curb and gutter; 4" rolled curb; 4" concrete sidewalk; 6" reinforced concrete driveway; speed table; ADA accessible ramps; and City Monuments. Roadway improvements will also include thermoplastic reflectorized pavement markings and new street sign assemblies. Landscape improvements include Rock mulch w/ weed fabric; minor grading; trees; of 5-gallon shrubs; 1-gallon shrubs; and irrigation system. Storm drainage improvements include concrete flumes; drop inlets; RCP pipe and manholes. Additionally, traffic and pedestrian control barricades, construction sequencing, and stormwater pollution prevention measures are required as part of this base bid Scope of Work. BASE BID II: The Water work for EDNA (EAST) AVENUE - STREET AND DRAINAGE IMPROVEMENTS consists of the installation of f 8-lnch C900 PVC (Blue) (Class 305) Pipe, 8-lnch Ductile Iron Pipe (350 psi) , (by open-cut methods), replacement and re-connection of water services, removal and disposal of existing water facilities, temporary by-pass, fire hydrants, fittings, cut in valves and all necessary appurtenances for the completed main or structure, including Trench Safety System. BASE BID III: The Sanitary Sewer work for EDNA (EAST) AVENUE - STREET AND DRAINAGE IMPROVEMENTS consists of the installation of 8-lnch PVC SDR-35, temporary by-pass, standard manholes, standard manholes & extra depth, re-connection of sanitary sewer services at the main, and all necessary appurtenances for the completed main or structure, including Trench Safety System. BASE BID IV: Street, drainage, and landscape improvements are proposed for approximately 2100-feet of Cortez Drive from Delta Drive to Flower Drive. Construction improvements under this phase of construction include the demolition of concrete, pavement, curb, trees, adjustment to existing vehicular gates, and upgrade of existing street signage. Proposed street improvements will include excavation of roadway and drainage improvements, and the installation of 2.5" HMAC/6" Base Coarse/6" Select Fill; 6" standard curb and gutter; 4" rolled curb; 4" concrete sidewalk; 6" reinforced concrete driveway; ADA accessible ramps; and City Monuments. Roadway improvements will also include thermoplastic reflectorized pavement markings and new street sign assemblies. Landscape improvements include rock mulch; trees; shrubs; tree root barrier; and irrigation system. Storm drainage improvements include drop inlets; RCP; junction box; and manhole. Water and Sanitary Sewer Improvements include water and sanitary sewer mains and services. Additionally, traffic and pedestrian control barricades, construction sequencing, and stormwater pollution prevention measures are required as part of this base bid Scope of Work. BASE BID V: The Water work for SOUTH CENTRAL PHASE V CORTEZ DRIVE WATER IMPROVEMENTS consists of the installation of 8-lnch C900 PVC 305 Pipe, 8-lnch Ductile Iron Pipe 350 psi, replacement and re-connection of water services, removal and disposal of existing water facilities, fire hydrants, fittings, pavement replacement and all necessary appurtenances for the completed main or structure, including Trench Safety System. BASE BID VI : The Sanitary Sewer work for SOUTH CENTRAL PHASE V CORTEZ DRIVE SANITARY SEWER IMPROVEMENTS consists of the installation of 12-lnch PVC SDR-35, 8-lnch P.V.C. C900 Green Sewer & 8-lnch Ductile Iron Pipe Sewer, Temporary By-Pass, Standard Manholes, Sanitary Sewer Services Reconnections, pavement replacement, and all necessary appurtenances for the completed main structure, including Trench Safety System

Award

Roads / Highways

$4,787,802.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
17
Bidding Soon
405
All Active Projects
151
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.