BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Berea, Ohio. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

https://www.wkyc.com/article/travel/ohio-turnpike-investing-more-than-230-million-projects-2022/95-a3118df8-ea98-42ba-aecf-4b0582a236f3 - BEREA, Ohio -- A big year is in store for the Ohio Turnpike. Yes, that will mean orange barrels and construction projects, but also modernized toll collection services and safer roadways. On Tuesday, the Ohio Turnpike and Infrastructure Commission announced that it has approved a $233 milion budget for improvement projects in 2022. The money will be spent on toll road modernization, mainline pavement replacement, resurfacing, bridge, and other projects for this year. With the news about the upcoming projects comes a reminder from turnpike officials to slow down in work areas. There were 1,443 vehicle crashes in work zones on the Ohio Turnpike from 2016-2020, averaging 289 crashes per year over the same five-year period, according to statistics provided by the Ohio Department of Public Safety "Speeding in work zones is a primary cause of crashes," said Ferzan Ahmed, executive director of the turnpike commission in a statement. "The Highway Patrol will be conducting speed enforcement, including aerial enforcement, in work zones on the Ohio Turnpike during the construction season." Here is how the $233 million in investment money is being distributed: Four resurfacing projects, which will remove and replace asphalt, upgrade guardrails and other roadway work ($36.2 million): The right and center lanes and right shoulder from milepost 178.05 to 185.65 (Summit County) and resurfacing the ramps at Exit 187 (Portage County). NOTE: There will be long-term lane closures on the mainline down to two lanes in each direction during the day with single lane zones (one lane of traffic) restricted to nighttime. ____________________________________________________________________________________________ Removal by milling of three (3) inches of existing asphalt pavement in the center and right lanes of the mainline, removal by milling of two (2) inches of existing asphalt in the left lane and left and right shoulders, mill and fill of the Sonic Nap Alert Pattern ("SNAPs") in the left, resurfacing of the pavement and shoulders to the thickness specified in the Drawings, concrete approach slab removal and replacement, patching of concrete bridge decks abutment slabs, concrete weatherproofing of bridges, full depth pavement repairs, installation of raised pavement markers and permanent pavement striping and/or other pavement markings, upgrading of guardrail, installation of SNAPs, and temporary traffic control, in both Eastbound and Westbound lanes. Removal by milling of three (3) inches of existing asphalt pavement on the interchange pavement and shoulders, resurfacing of the interchange pavement and shoulders to the thickness specified in the Drawings, full depth concrete pavement repairs of portions of interchange ramp pavement, installation of raised pavement markers and permanent pavement striping and/or other pavement markings, upgrading of guardrail, temporary traffic and all other items incidental to the completion of the Work. A Contract will be awarded, if any award be made, to the Bidder determined to have submitted the lowest responsive and responsible Bid for the performance of the Work. The Commission reserves the right to reject any and all Bids and to waive minor irregularities or technical deficiencies. The Small Business Enterprise (DBE/EDGE/SBE) Goal applicable to this Project is 10%. Prevailing Wage Rates and Equal Employment Opportunity requirements apply to this Project. Any question, other than a request for interpretation or clarification as provided in , shall be submitted to the Commission's Procurement Manager in writing, by electronic mail at purchasing@ohioturnpike.org. $1,000.00 for each day that the failure to achieve the Final Completion for art A and Part B continues beyond the time ANSWERS TO QUESTIONS RECEIVED THROUGH 8:00 A.M. ON FEBRUARY 18, 2022

Post-Bid

Roads / Highways

$200,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
96
Bidding Soon
1,034
All Active Projects
398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.