BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and new construction of a mixed-use development in Kernville, California. Completed plans call for the demolition of a playground / park / athletic field; for the construction of a playground / park / athletic field; for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

The USDA, Forest Service (FS), Southwest Zone, has an anticipated requirement to furnish and Between $250,000 and $500,000 Provide all labor, equipment, and material to accomplish the work under this project at three locations around Lake Isabella on Sequoia National Forest land. Work includes but is not limited to the following major items: A. Sewage Systems: 1. Demolish and dispose sewer systems at eight (8) toilet locations (one at Camp 9 CG and seven at Tillie Creek CG). Pump and rinse out septic tanks; drill a 4-inch hole in the bottom of the vault for drainage; demolish and remove all septic tank components to 2 feet below ground surface; demolish top of septic tank; and backfill and compact the septic tanks with approved backfill to flush with adjacent grade. Three sewer systems at Tillie Creek CG include dosing tanks with the septic tanks; to be demolished similar to septic tanks. B. Secondary Overhead Electrical Service: 1. Disconnect and remove secondary overhead electrical service from well house to three toilet locations, including poles, wiring, and accessories. Salvage poles without damage and stockpile for the government adjacent to the pump house. Backfill and compact holes left from poles or buried utility boxes. C.Accessible Sidewalks at Toilets: 1. Construct accessible sidewalks at double vault toilet buildings as listed below at three locations around Lake Isabella as Shown on the Drawings, including earthwork, formwork, reinforcement, concrete placement, finishing, and cleanup. a. Camp 9 CG - i. Two locations with pairs of double vault toilets (double doubles) ii. Four locations with individual double vault toilets b. South Fork Recreation Area - i. One location with a pair of double vault toilets (double double) c. Tillie Creek CG - i. Seven locations with pairs of double vault toilets (double doubles) D. Accessible Parking at Toilets: 1. Construct one accessible parking space at vault toilet buildings as listed below at three locations around Lake Isabella as Shown on the Drawings, including earthwork, formwork, reinforcement, concrete placement, finishing, and cleanup. a. Camp 9 CG - ii. Two locations with pairs of double vault toilets (double doubles) iii. One location with individual double vault toilet. Between $250,000 and $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - Federal

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
19
Bidding Soon
299
All Active Projects
133
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2022

May 18, 2022

img_map_placeholder

Multiple Locations, Kernville, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.