EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a clubhouse / community center in Santa Ana, California. Completed plans call for the renovation of a clubhouse / community center.

Remove and replace existing roof and HVAC system. Furnish and install new roofing material and A/C units. The required deposit for this permit shall be as described in the Bid Proposal. Bid Proposal Guaranty: A scanned copy of the Bid Proposal Guaranty shall be uploaded to PlanetBids along with project bid. Bid Proposal Guaranty shall be in the form of a cashier's or certified check payable to the City of Santa Ana, or Bid Bond issued by a corporate surety, in an amount not less than ten percent (10%) of the bid aggregate, as a guarantee that the Bidder will enter into the proposed contract if the same is awarded. The signature of the bidder on the bid bond must be notarized. In addition to electronic Bid submittals, Bidders shall deliver an original hard copy of the Bid Proposal Guaranty. For further instructions regarding original Bid Proposal Guaranty submittal, refer to PlanetBids. Failure to provide required documents with Bid may cause the bid to be deemed non-responsive.

Award

Clubhouse / Community Centers

$1,240,500.00

Public - City

Renovation

10

7

4

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Metal Roof Panels, Joint Protection
Division 08 - Openings

Division 08 - Openings

Windows
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
141
Bidding Soon
2,619
All Active Projects
1,040
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

March 17, 2023

img_map_placeholder

706 N Newhope St, Santa Ana, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Salgado Community Center Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.