BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Moultrie, Georgia. Working plans call for the construction of a 3,600-square-foot transportation facility; and for site work for a transportation facility.

The owner has selected a Design Builder. A timeline for construction has not yet been established. Final design and construction of a 3,600 SF single-story terminal building with air-side canopy and landside porte-cochere. The building shall be located near the southeast limits of the existing terminal area parking lot. Associated site work, including any necessary improvements to the existing parking lot, is not included in the scope of work for this project. The Work of the Project is defined by the Contract Documents and consists of the following: 1. Contract A - General Trades: Work generally consists of general construction work, building and area within 5 feet of building perimeter (and as further defined in this section and on the Conceptual Site Plan C-100). 2. Contract B - Sitework (FUTURE): Work includes site preparation; including grubbing, removal of topsoil; and erection of temporary fencing; selective demolition, site grading; site utilities including sanitary, storm, and water service; erosion control and final restoration surfaces including curbing, paving, sidewalk and seeding. Each bid must be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the total maximum bid price for the contract in the form and subject to the conditions provided in the Preparation of Proposal. The Moultrie-Colquitt County Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The right is reserved to waive any informalities in the bid and to reject any and all bids. Copies of the plans, specifications, and bid forms shall be on file at the following locations: the Moultrie-Colquitt County Airport Authority and the Engineer's office, Passero Associates, LLC: - 3855 Shallowford Road, Suite 310, Marietta, GA 30062 and/ or - 4730 Casa Cola Way, Suite 200, St. Augustine, FL 32095 They may be examined at these offices without charge.

Pre-Construction/Negotiated

Transportation Terminals

$1,400,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
60
Bidding Soon
617
All Active Projects
320
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 3, 2022

November 3, 2022

January 2, 2023

img_map_placeholder

189 Airport Dr, Moultrie, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.