BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2022 at 7:00 PM

Updated September 14, 2023

Renovation of an educational facility in Framingham, Massachusetts. Completed plans call for the renovation of a educational facility.

Concrete Stair Repairs at the King school facility located at 454 Water Street in Framingham, MA This project includes providing all materials, labor and equipment to complete the scope of work, including, but not limited to, demolition, removal and disposal of existing concrete and steel materials, waste, and debris cleanup; installation of formwork, reinforcing, and embedded steel items; preparation of surfaces and cavities, placement of concrete; and cleaning, painting and reinstalling existing railings. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Bid Results

Educational

$58,850.00

Public - City

Renovation

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
782
Active Projects
395
Bidding Soon
4,215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 25, 2022

Project location map

454 Water St, Framingham, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.