BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Portsmouth, Virginia. Completed plans call for site work for a water / sewer project; and military facility.

As of February 20, 2023, construction is underway and most of the buyout is complete. Award Details Contract Award Date: Sep 23, 2022 Contract Award Number: N4008522C0047 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: EJHTLA7NAFH4 Contractor Awarded Name: MEB GENERAL CONTRACTORS, INC. Contractor Awarded Address: Chesapeake, VA 23323-1522 USA Base and All Options Value (Total Contract Value): $168758300.00 SOLICITATION N40085-22-R-2598 P-678 DRY DOCK 8 SALTWATER SYSTEM FOR CVN-78, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA To access the drawings and specifications for this solicitation, please see Notice ID N40085-22-R-2598_Drawings for the P678 Drawings and Notice ID N40085-22-R-2598_Specificiations for the P678 Specifications. All correspondence regarding this solicitation shall be directed via email to Rachel Honecker at rachel.n.honecker.civ@us.navy.mil. 1.1.1 This acquisition is being solicited on an unrestricted basis, with Full and Open Competition. 1.1.2 The NAICS code for this procurement is 237990 and the size standard is $39,500,000. 1.1.3 In accordance with DFARS 236.204, the magnitude of construction for this project is between 100,000,000 to $250,000,000. 1.1.4 This solicitation is formatted as a Request for Proposal according to FAR Part 15. This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. Description of Work: N4008522R2598 Page 8 of 74 This project is comprised of two phases of construction with a ship docking between Phase 1 and Phase 2. Phase 1 will construct 34.5kV site power distribution including underground duct banks, feeders, pad mounted switches, 34kV- 4.16kV substations and underground feeders to Pumpwell 8. Pumpwell 8 construction consists of Pumpwell 8 drainage capacity upgrades, L=HP0- replacement of Main Drain Pump (MDP) motors, back-up power for drainage pumps, interior electrical upgrades for a 4.16kV system to serve the drainage and MDP pumps, control booth and console, and SCADA system upgrades. Supporting structural and site upgrades include installation of micropile foundations, monorail, temporary pumpwell suction chamber plugs, pumpwell drainage piping routed through the abandoned South flooding flume, outfall structure, temporary cofferdam, railroad repairs and underground utilities relocation and paving. Phase 2 will demolish two pump stations and their saltwater intake structures (Buildings 828 and 829) and construct two saltwater pump stations including their saltwater intakes, back-up power, and pile foundations including additional timber wharf piles. The project will construct an underground saltwater distribution system around the dry dock including direct buried piping and utility tunnel penetrations. Saltwater feeders will supply the North and South sides of the dry dock gallery and coping level with saltwater for cooling and firefighting needs through multiple piping manifolds. Saltwater return piping will be routed along the dry dock wall and transition into the abandoned North and South flooding flumes to outfall structures at the river. Temporary cofferdams will be required. Sitework includes crane rail reconstruction, railroad repair, utility relocations and paving. PRE-PROPOSAL CONFERENCE AND SITE VISIT: The site visit information will be provided via Amendment. 4.2 PROPOSAL SUBMISSION INSTRUCTIONS: In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non-Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Under Construction

Military

$168,758,300.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
27
Bidding Soon
604
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

February 1, 2023

img_map_placeholder

Multiple Locations, Portsmouth, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.