BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in South Hamilton, Massachusetts. Completed plans call for site work for a water / sewer project.

The scope of work includes the construction of a new pre-cast concrete vault at the intersection of Mudge Avenue and Lee Park in Hamilton, MA to house a new 6-inch backflow preventer, 6-inch compound service meter, 6-inch flanged ductile iron piping and appurtenances. The work also includes the installation of new 6-inch ductile iron pipe, gate valves and fittings to connect the new vault piping to the existing water main, new copper water service, site restoration, and the demolition and removal of an existing 4-foot diameter block meter chamber, water meter, water service and curb box, and associated piping All bids for this project are subject to applicable public bidding laws of Massachusetts, including, but not limited to G.L. c.30, Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of Massachusetts General Laws, Chapter 149, Section 26 through 27D inclusive. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids. The Town reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.

Award

Water / Sewer

$145,000.00

Public - City

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
137
Bidding Soon
2,489
All Active Projects
1,018
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

November 15, 2022

img_map_placeholder

Mudge Avenue and Lee Park, South Hamilton, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.