Site work for a water / sewer project in Richardson, Texas. Working plans call for site work for a water / sewer project.
As of 6/21/2022 no award has been made. A timeline for the award has not yet been established. The City of Richardson, Texas is pleased to be accepting qualifications for a Construction Manager at Risk ("CMAR") to provide preconstruction and construction services for the Construction of Water Improvements to Expand the 825 Pressure Zone Capacity of the City's Water Distribution System project. The City will be using a two-step CMAR selection process in accordance with Texas Government Code Chapter 2269, Subchapter F, and this RFQ is the first step in the selection process. There is no pre-submittal conference. Questions related to this RFQ may be submitted via Periscope by no later than Thursday, February 10, 2022 at 4:00 P.M. The Northside II Pump Station (NSPS) expansion will consist of 15 MGD (firm) additional capacity, including pumps, motors, piping, valves, electrical equipment, chemical feed system, pump station building, electrical equipment room, security station and generator. Pump station will include HVAC, architectural, structural, plumbing, electrical, instrumentation, and controls as required. Pumps will be side suction horizontal split case pumps. A. Pump station facility will be of masonry construction with a below ground pump room and above grade electrical room, so the horizontalsplit case pumps are located below grade. Two below grade flow meter vaults and flow meters are included in the design. B. Site improvements including site piping, valves, site power distribution, site lighting, fencing, grading and drainage, roads and parking, landscaping, irrigation, site water and wastewater utilities, fire protection water lines, potable water lines, telephone utility connections, and fieldinstrumentation. C. Flow Meter vaults will include lighting, receptacles, sump pumps and ventilation. D. Back-up diesel electric generating facilities with a generator connection cabinet. Automatic transfer switch controls will be provided in the main electrical equipment line-up. Generator will provide back- up power for firm capacity of the pump station. E. Electrical system will support the pump station including switchgear, motor controllersincluding variable frequency drives,step-down transformers, panelboards, control panels and SCADA cabinet. Electrical and SCADA equipment will be located in the electrical room. Electrical room is located above grade. F. Communications include connecting to the existing fiber system in the existing Northside PS. Provide conduits on site and make connections. G. Security facilities including fencing, crash barriers at gates, access control, entry monitoring and video surveillance cameras. Access control and video control systems will be standalone systems at the site with provisions for future remote monitoring at the Owner's central operations center via the future fiber connection. H. A sodium hypochlorite (12.5-percent solution) and liquid ammonium sulfate (40- percentsolution)storage and feed system forthe purposes of boosting the chloramine residual. Fire Protection is included as part of the scope of this facility. I. Demolition of existing park structuresto include the pavilion and approximately 400 linear feet of trail
Final Planning
Water / Sewer
$1,383,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 22, 2022
August 22, 2022
Multiple Locations, Richardson, TX
Related To This Project
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
Bid Date: Jul 17 2020
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
Bid Date: Jan 26 2022
Richardson, TX
--
Richardson, TX
--
Richardson, TX
--
Richardson, TX
Bid Date: Oct 10 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.