BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2022 at 7:00 PM

Updated November 15, 2023

Site work, asbestos abatement and renovation of an educational facility in Forreston, Illinois. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Asbestos Abatement for 2022 Renovations at Forreston Jr.Sr. High School, 601 E. Main Street in Forreston, IL 61030. The work is to remove windows with asbestos-containing glazing (approximately 25 windows in 8 openings) from the original 1955 building utilizing NESHAP removal methods; window panes and asbestos-containing glazing (approximately 45 panes) at the Jr High/District Office main entry vestibule and at the southwest vestibule utilizing NESHAP removal methods; base cabinets with transite back panels (approximately 95 square feet) from Classroom 309 under the school O & M program; and flooring materials (approximately 6,065 square feet) from various classrooms and the Jr. High office area utilizing non-friable methods. The Date of Commencement is June 13, 2022. The Date of Substantial Completion is June 24, 2022.

Post-Bid

Educational

$300,000.00

Public - City

Asbestos Abatement, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
163
Bidding Soon
1,884
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2022

June 13, 2022

Project location map

601 E Main St, Forreston, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.