BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Wayne, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot.

**As of June 03, 2022, project was awarded to N. Abbonizio Contractors, Inc., awarded amount is $4,156,338.23.** SOUTH WAYNE MUNICIPAL PARKING LOT FLOOD REDUCTION PROJECT including removal of the existing asphalt, excavation and disposal of subsurface material, the installation of subsurface modular stormwater storage structures, installation of new pipes and inlets, erosion and sediment control, landscape restoration, and other work as described on the Plans and Contract Documents, complete in place. Radnor Township reserves the right to add or delete portions of work based on budgetary constraints. The award date for this project is tentatively scheduled for Monday, April 11, 2022. The project must be completed no later than 180 days after notice to proceed. The Township will not accept bids from any firm/corporation that are currently in litigation with the Township. This is a prevailing wage project. In the event of a delay to the project completion terms as per the Schedule for which Contractor is solely responsible, Contractor shall pay Liquidated Damages to Radnor Township at a rate of $880 per day of delay for every day beyond the 180 days for allowed for project completion. A bid security in the amount of ten percent (10%) of the total bid is required. Bid security shall be in the form of either a Bond issued by a corporate surety approved by the Secretary of Insurance to do business in the Commonwealth of Pennsylvania, or a certified check or an Irrevocable Letter of Credit issued by a bank licensed to do business in the Commonwealth of Pennsylvania. The Township Board of Commissioners reserves the right to waive any informalities and reject any or all proposals, or parts thereof, for any cause permitted by law, as it deems in the best interest of the Township. The standard under which bids will be evaluated and other bid requirements and instructions to bidders are included in the bid package. The Contractor shall furnish the following goods and/or services, at the prices, and for the period, all as indicated on the Detailed Specifications, Proposal Report, Project Specifications, and/or Project Manual included in the bid package for the SOUTH WAYNE MUNICIPAL PARKING LOT FLOOD REDUCTION PROJECT (CONTRACT #B-22-002). All items and/or services furnished shall be in complete conformance with all the Contract Documents (as defined in the Instruction to Bidders and as set forth below) except for such deviations as may be incorporated in writing with the Agreement of the Township. SERIAL# 20183342431 , 20183342424 ,20183342359, 20183342385 ,20183342401 CLARIFICATION DEADLINE 3/28/2022 4:00 PM In the event of a delay to the project completion terms as per the Schedule for which Contractor is solely responsible, Contractor shall pay Liquidated Damages to Radnor Township at a rate of $880 per day of delay for every day beyond the 180 days for allowed for project completion.

Award

Sidewalks / Parking Lot

$4,156,338.00

Public - County

Site Work

49

24

58

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
819
Active Projects
450
Bidding Soon
5,633
All Active Projects
2,511
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

May 6, 2022

img_map_placeholder

To Be Determined, Wayne, PA

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.