BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Cottage Grove, Oregon. Completed plans call for the renovation of a water / sewer project.

The successful bidder will provide Equipment that shall be pre-purchased for installation by others within an existing circular secondary clarifier tank at the City of Cottage, Oregon Wastewater Treatment Plant (WWTP). The existing Secondary Clarifier No. 1 is a center feed, peripheral overflow design with an outboard concrete launder and center sludge hopper configuration. The Equipment shall be designed for gravity separation of mixed liquor solids from the activated sludge process and shall be specifically designed for installation within the existing Secondary Clarifier No. 1 and existing conditions. Equipment shall be furnished complete with all mechanical and electrical components and accessories required for proper installation and operation, including complete drive units and controls, and any additional materials or construction required by the manufacturer to meet the requirements of the pre-purchase package. The supplier shall furnish a system that is fully coordinated and operating properly. All items required for a complete and properly operating system shall be provided, whether specifically called for or not. Site Directions: 1800 N Douglas, Cottage Grove, OR, 97424 Est. Completion Date: Dec. 30, 2022 A liquidated damage fee of $150 per day will be deducted from the final payment for late delivery and acceptance

Bid Results

Water / Sewer

$433,770.00

Public - City

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
9
Bidding Soon
127
All Active Projects
62
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

April 21, 2022

img_map_placeholder

1800 N Douglas Ave, Cottage Grove, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.