EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2022 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in Eufaula, Alabama. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Eufaula Rehabilitaion Unit Pump The magnitude for this project is Between $250,00 and $500,000. Period of Performance: 03/03/2022 to 07/29/2022 Bid Items: 1. Erosion Control - Install perimeter and in-water erosion control as per construction drawings 2. Remove existing pump - send to manufacturer "MWI 7775 SW 9th St, Vero Beach FL 32968" for rebuild. 3. Remove existing diesel engine driver, remove all oils, contractor to recycle engine. 4. Rebuild pump-remove existing pump and "MWI" to modify with extended direct drive and reinstall rebuilt pump. 5. Replace diesel engine - replace diesel engine with EPA rated skid mounted diesel engine 6. Replace belt drive with shaft drive for higher efficiency. 7. Replace exhaust and muffler. 8. Remove existing fuel lines and install new fuel lines routed so as not to create trip hazards. 9. Provide oil drain extension for easy maintenance. 10. Repaint concrete fuel tank and relabel. 11. Apply rust inhibiting coating to exposed discharge pipe and pump shaft connection bracing. 12. Provide solar battery to power diesel engine. 13. Provide solar powered LED lighting and lighting protection. 14. Include solar power trickle charger to power the engine. 15. Provide bird deterrent solar designs and wildlife deterrent wiring designs. 16. Repair roof joists that were damaged in kind; Install lightning protection, grounding 17. Clean existing concrete pad 18. Remove all erosion control, restore site to original conditions 19. Provide existing pump pressure test before removal and after rebuild and re-install. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Renovation, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting, Exterior Painting, Interior Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
28
Bidding Soon
359
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 3, 2022

img_map_placeholder

367 AL-165, Eufaula, AL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rehabilitation Of The Bradly Pump Station

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.