Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 21, 2022 at 7:00 PM
Updated January 26, 2024
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a primary / secondary education facility.
The work consists of consists of Exterior site work, Renovate the existing MEP at Mather HS; Hot water boiler plant replacement, duel temp. water circulation pump, HWCH , Pool dehumidification unit, and Emergency Generator replacement. Additional scope includes cooling tower platform upgrade, gym lighting replacement, gym ceiling upgrade, painting, and new CCTV & Intrusion Detection System. The work includes gypsum board, doors and hardware, plumbing fixtures, cabinet unit heaters, roofing, paint, new epoxy floor finishes and LED lighting. Trades included but not limited to: Selective Demo., Cast-In-Place Concrete, Masonry, Metal Fabrications, Gratings & Floor Plates, Roof Patching, Traffic Coatings, Roof Accessories, Firestopping, Joint Sealants, D/F/H, Glazing, Wood Athletic Flooring, Drywall, Exterior & Interior Painting, Plumbing, HVAC, Electrical, CCTV System, Building Intrusion Detection, Asphalt Paving & Sealcoat, Concrete Paving, Pavement Markings, & Natural Gas Piping. STREET ADDRESS: 5835 N. Lincoln Ave., Chicago Illinois 60659 Scope of Work is to renovate the existing MEP at Mather HS: Exterior Site Work, Hot Water Boiler Plant Replacement; Dual Temp Water Circulating pump, HWCUH, Pool dehumidification unit, and Emergency Generator replacement. Additional scope includes: Cooling tower platform upgrade; Gym lighting replacement; Gym Ceiling upgrade, painting, and new CCTV & Intrusion Detection System Contractor Full Mobilization 06/20/2022 Completion of Punch List 11/14/2022 Submission of all Close-Out Documentation 12/01/2022 Final Completion (60 days from PA) 12/31/2022 11-Month Warranty Walkthrough (From PA) 09/15/2023
Post-Bid
Educational
$500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 22, 2022
June 20, 2022
5835 N Lincoln Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Dec 21 2021
George Armstrong Elementary School - Roof Replacement, Masonry Repairs, HVAC, and Painting - 4534417
Chicago, IL
Bid Date: Feb 08 2022
Chicago, IL
Bid Date: Feb 09 2022
Chicago, IL
Bid Date: Dec 22 2021
Chicago, IL
Bid Date: Nov 16 2021
Chicago, IL
Bid Date: May 18 2021
Chicago, IL
Bid Date: Jun 08 2021
Chicago, IL
Bid Date: Feb 11 2021
Chicago, IL
Bid Date: Mar 21 2022
Chicago, IL
Bid Date: Apr 18 2023
Chicago, IL
Bid Date: Apr 18 2023
Chicago, IL
Bid Date: Mar 30 2023
Chicago, IL
Bid Date: Apr 06 2023
Chicago, IL
Bid Date: Mar 31 2023
Chicago, IL
Bid Date: Mar 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
