BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kingston, Ontario. Completed plans call for the renovation of a educational facility.

Duncan McArthur Hall was built between 1969 and 1971 in two phases - A-wing and B-wing and it is home mainly to the Faculty of Education comprising mostly of administration offices, classrooms, lecture theatres, labs, technical shops, and a large education library. It also has a large auditorium which is heavily used throughout the year by Queen's and the Kingston community. Although McArthur Hall has had upgrades and renovations over the years, the main electrical service equipment (located in the A-wing and B-wing main electrical rooms) and the Motor Control Centre (MCC) are late 1960's-early 1970's-vintage and requires upgrade/replacement. Both A-wing and B-wing electrical rooms each contain (at least) one 4160 volt fused load break switch, a 1000kVA 4160-208/120V dry-type transformer and a 3000 amp 208/120V switchboard containing both draw-out air circuit breakers and molded case circuit breakers. The A-wing electrical room also houses additional 4160-volt load break switches as Duncan McArthur Hall is loop fed (incoming/outgoing 4160V) and currently powers the West Campus Central Plant building at 4160V on a radial feed. Currently, McArthur Hall is fed directly from Utilities Kingston (UK) via UK 1201 but can be backfed from UK706 with Utilities Kingston's permission and aid. The B-wing electrical room is fed at 4160V from the A-wing electrical room. The intent of the project is to replace most of the original equipment in the main electrical rooms and two motor control centres. The Scope of Work pertains to the upgrade of the equipment in the main electrical rooms of A and B wings including, but not limited to replacement of 4160V switches, transformers and switchboards, feeders, a new 600A automatic transfer switch, and two 600A MCCs. Preferred Schedule: Start Date: March 2022 Preferred Completion Date: The project to be completed as quickly as possible and no later than August 21, 2022.

Award

Educational

$1,560,100.00

Public - State/Provincial

Renovation

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
23
Bidding Soon
526
All Active Projects
222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

May 1, 2022

img_map_placeholder

511 Union St, Kingston, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.