Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 6, 2022 at 7:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Tulalip, Washington. Completed plans call for site work for a water / sewer project.
The Consolidated Borough of Quil Ceda Village is soliciting proposals from qualified consultants to assist the Village with wetland delineation services. The goal is to conduct wetland delineation in accordance with the Regional Supplement to the Army Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys and Coast Region (Vers 2.0), physically flag wetlands and obtain GPS location data for those flags as well as the delineation data points. The target areas for delineation are located primarily west of 27th Ave NE, within Quil Ceda Village, in the vicinity of 88th St NE to 105th St NE, in the area formerly known as the Boeing Test Site. (see attached Maps and RFP). For questions, contact Allison Warner at awarner@tulaliptribes-nsn.gov or Phone (360) 716-5069 Fax number is (360) 716-0052. Quil Ceda Village will make available to the Consultant relevant background materials to allow the Consultant to develop an understanding of site conditions. This includes GIS information such as topographic layers, LiDAR, drainage feature maps, hydric soils, available wetland inventory information, and roads. Site water table monitoring well data will also to be provided. A GPS unit may be loaned as necessary to allow for higher quality GPS data. The work will need to be conducted during the first two months of the growing season and timed with when water tables have risen in the project area. In past years, sometimes water tables drop dramatically on the site in mid- April. Due to the rapidly fluxuating water table, consultation with the project lead will be required to ensure flagging is accurate. Water tables can rise for a week and then fall and not meet hydric criteria in some areas. Approximately 25 acres of wetlands are encompassed in the 33-acre delineation area. See Maps B-D. All of the wetlands have been the subject of detailed wetland inventory, with soil logs, water table monitoring and numerous reconnaissance points, which will be made available to the contractor. This contract will be final step of final boundary delineation
Post-Bid
Water / Sewer
$130,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed