Site work and paving for a mixed-use development in Aberdeen, Mississippi. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The above general outline of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. The contract time is 90 consecutive calendar days. Liquidated damages will be assessed in the amount of Two Hundred Fifty Dollars ($250.00) for each calendar day the Work has not achieved Substantial Completion. Special Damages - In addition to the amounts provided for liquidated damages, Contractor, in the event of such default, shall pay the Owner the actual costs reasonably incurred by Owner for engineering and inspection forces employed on the work after the time stipulated for the completion of the work. CERTIFICATE OF RESPONSIBILITY: Each contractor submitting a bid in excess of $50,000.00 must show on his bid and on the face of the envelope containing the bid, his Certificate of Responsibility Number, as required by Section 31-3-21 and 21-3-15, Mississippi Code of 1972. If the bid does not exceed $50,000.00, a notation so stating must appear on the face of the envelope. EVIDENCE: No bid will be opened, considered or accepted unless the above information is given as specified. Proposals shall be submitted in a sealed envelope and deposited with the City of Aberdeen prior to the hour and date herein before designated. No bidder may withdraw his bid within ninety (90) days after the actual date of the opening thereof. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent (5%) of his bid, payable to the City of Aberdeen, as bid security. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of one hundred percent (100%) of the contract amount. Bid results - Schedule A - Ausbern Construction Co. - $382,500.00 Schedule B - Ausbern Construction Co. - $32,500.00 Schedule C - Ausbern Construction Co. - $127,050.00

Award

Water / Sewer

$402,500.00

Public - City

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
49
Bidding Soon
420
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

June 1, 2022

Project location map

To Be Determined, Aberdeen, MS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.