BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Jacksonville, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; for outdoor lighting for a road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

The three design-build teams that bid to build-out the fairgrounds infrastructure are: o J.B. Coxwell Contracting Inc. and GAI Consultants Inc. o AJAX Building Co. LLC and CHW Professional Consultants. o Philips & Jordan Inc. and Haskell. City procurement officials will score the April 28 presentations/bids and the committee could make a selection before the end of May. City Council earmarked $15 million to help relocate the fairgrounds out of Downtown when it approved Mayor Lenny Curry's five-year Capital Improvement Plan in September 2021. The fair is working with Scherer Construction of North Florida LLC and Kasper Architecture + Associates Inc. to design and determine the cost of the facilities it wants in a new fairgrounds, Olson said. What's planned Plans include a 40,000- to 60,000-square-foot event and expo center; administrative offices; a warehouse-style storage facility; and an event stage able to accommodate multiday music and entertainment festivals. There also would be a multipurpose barn that Olson said would be used for the livestock and agricultural activities and be built on the adjacent city-owned Equestrian Center property. He said the fair leadership is scheduled to meet April 29 with the Northeast Florida Equestrian Society, the nonprofit operator of the Equestrian Center, to continue talks about the barn. "It's going to be a benefit to the Equestrian Center because they're going to use it year-round to do their bigger shows," Olson said. "They have a need, too, for that type of facility." The new fairgrounds will use Finger Lake Street as an access road off of POW-MIA Memorial Parkway and built several entrances and exits on Normandy Boulevard, Olson said. The site is close to Cecil Commerce Center. He said the fair would take the estimates and obtain funding that would be paid back with the sale proceeds. Olson hopes the entertainment stage can bring year-round events that can make up for the parking revenue the fair association will lose by moving away from the stadium complex. He said the campgrounds, parking and RV hookups at the Equestrian Center could bring in music festivals and even entice the Welcome to Rockville festival back to Duval County after it moved to Daytona Beach in 2021. _________________________________________________________ The scope of work required of the selected Design-Build Firm for this project may include design, permitting, and construction elements necessary for the Fairgrounds Relocation The scope of work required of the selected Design-Build Firm for this project may include, but not be limited to, the following design, permitting, and construction elements necessary for the Fairgrounds Relocation: renovation or new construction of roadways, drainage systems, intersection improvements, streetscapes, sidewalks, pavement marking and signing, parking areas, traffic signing and signals, lighting, retaining walls, bulkheads, bridges, culverts, utility construction/repair, underground and/or aboveground utilities, and various other appurtenant work in accordance with the requirements specified in the Design Criteria Package prepared by City. Any questions please contact the buyer at aburney@coj.net. The initial term of agreement will commence upon execution of the design-build contract ("Contract") and will continue for a five (5) year period. QA deadline : 25 feb 4: 00 PM

Award

Playgrounds / Parks / Athletic Fields

$13,637,900.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
69
Bidding Soon
1,151
All Active Projects
455
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 9, 2022

August 1, 2022

July 7, 2027

img_map_placeholder

510 Fairground Pl, Jacksonville, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.