BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a wastewater treatment plant.

The project will demolish the plant's existing chain link fencing and replace with approximately 4,100 linear feet of 8-foot tall modular fencing with high-strength cut-resistant and climb-resistant mesh, barbed wire, and razor coil. Work will also include installation of new vehicular cantilever sliding gate with electric operator, manual double swing gates, pedestrian access gates, and all associated civil site work, electrical controls, and appurtenant work. For technical questions concerning the project, plans, and specifications, contact Sunny Lo at (562) 908 4288, extension 2136. The Board of Directors may award the contract for the above described work, either at the meeting of the Board of Directors to be held at the above-stated address, on March 23, 2022 beginning at 1:30 p.m., or at any other meeting of the Board of Directors within 120 days after the date listed above for receipt of bids. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 210 Working Days after the date in the Notice to Proceed. Est: Value Notes: 2,400,000-3,600,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$2,375,129.00

Public - County

Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
106
Bidding Soon
2,268
All Active Projects
1,014
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

April 29, 2022

img_map_placeholder

1965 Workman Mill Rd, Whittier, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.