BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Allen, Texas. Completed plans call for the renovation of a fire / police facility.

Police Department Headquarters Replacement of Air Handlers Construction Estimate: $450,000.00 1. Demo seven (7) existing AC system, including disconnections. Remove and dispose of; 2. Provide submittal information to Engineer/Owner for new Air Handlers, matching the drawings specifications and details prepared by Baird, Hampton, and Brown, attached as part of this Invitation for Bid, Solicitation #2022-1-36; Submittal is required to be provided to Baird, Hampton & Brown, within three (3) days of written notice to proceed by Owner, to contract awarded Vendor; 3. Order/purchase new Air Handlers, within 48-hours of receiving approved submittal from Baird, Hampton & Brown; 4. Apply for and obtain City of Allen permit with the Building Department, including all mechanical, electrical, and plumbing work no less than 30-days PRIOR to Air Handler ship date. Permit will be free of charge to bid awarded Contractor; 5. Provide turn-key installation of new system, including placement, connections to all mechanical, electrical, plumbing, piping, start-up and testing; 6. Call for and obtain ALL required City inspections for mechanical, electrical, and plumbing work associated with this Project. Bid awarded contractor is to familiarize himself with the City automated inspection system for scheduling inspections. Failure to learn the system is not grounds for asking City representatives to schedule inspections for you; 7. City will require contractor to schedule and obtain factory representative inspection and written signoff of start-up and testing before accepting the project; 8. Obtain written acceptance of the Project from Baird, Hampton, & Brown (Engineer); 9. Provide Owner with all factory warranties, contractor's warranties; and final 2-year Maintenance Bond; 10. Coordinate system installation with City contracted energy management controls Vendor to insure smooth tie-in and start-up of controls. Q&A date feb 22,2022 at 12:00 pm

Post-Bid

Fire / Police

$450,000.00

Public - City

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
64
Bidding Soon
3,493
All Active Projects
1,329
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.