BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2022 at 8:00 PM

Updated June 15, 2024

Site work and paving for a sidewalk / parking lot in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construction of a Pedestrian Trail along Fondren Diversion Channel (HCFCD Unit No. D1400-00-00) from West Bellfort Avenue to Willowbend Boulevard, Precinct 1 TDLRTABS2022001299 UPIN NO. 18101MF0W301 COH WBS No.: N-HC0100-0018-7 Job 22/0001 The Work will be completed and ready for Final Payment in accordance with paragraph 6.5 of the General Conditions within 90 calendar days The County requires Vendors to make a good faith effort to meet or exceed a 22% goal for participation by M/WBEs on this project The Trail along Fondren Diversion Channel (HCFCD Unit No. D140-00-00) project will construct approximately 4,010 linear feet of trail from West Bellfort Avenue to Willowbend Boulevard in southwest Houston, Harris County. The trail will connect an existing trail ending at Willowbend Boulevard and continue the trail south to W. Bellfort Ave. with a new 10-foot wide concrete shared-use path. The trail improvements to be performed shall include but are not limited to the following: 1. Clearing and excavation for new concrete trail along Fondren Diversion Channel. 2. Removal of existing backslope intercepts. 3. Removal of existing ramps and sections of existing sidewalk. 4. Construction of approximately 4,010 linear feet of a 10-foot wide concrete shareduse path, including new backslope intercepts (8) and new swale. 5. Construction of sidewalk connections and ramps. 6. Installation of street crossing signage and pavement markings. 7. Provision of storm water pollution prevention measures during construction. 8. Implementation of storm water quality management plan. 9. Clean up. The above description of the scope of work is general in nature and is intended as an overview of the project only. The complete detailed scope of work and bid items are contained in the construction drawings and specifications. Questions Due Date: Feb 18th 2022, 12:00 PM CST

Award

Sidewalks / Parking Lot

$899,507.00

Public - County

Paving, Site Work

79

5

2

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
235
Bidding Soon
3,806
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2022

March 30, 2022

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.