Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a water / sewer project in South Paris, Maine. Completed plans call for site work for a water / sewer project; for the demolition of a water / sewer project; and for the construction of a water / sewer project.
A tank replacement including demolition of the existing storage facility, site work, and construction of a new 500,000-gallon prestressed wire wound concrete water storage tank adjacent to the existing tank. The project also includes an active tank mixer, new instrumentation and radio equipment, an extension of single-phase electrical service eliminating the existing solar powered radio system, and upgrades to the existing access road including a new gravel base and cross culvert. Engineer's Estimate: $1,400,000 The Owner reserves the right to reject any or all bids,including without limitation, nonconforming,nonresponsive, unbalanced, or conditional Bids.Owner also reserves the right to waive all minor Bid informalities not involving price,time,or changes in the work. 1. Construction of: a. New 500,000-gallon wire-wound precast concrete storage tank; b. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings; c. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Existing 500,000-gallon Hooper Ledge buried cast-in-place concrete tank. b. Other existing structures shown on the plan c. Piping and conduit, as indicated on the Drawings; 3. Remove and/or relocate equipment as indicated on the Drawings and as described below but not limited to: a. Existing RTU Control Panel b. Existing wood utility pole to be relocated with radio antenna 4. The Owner will furnish the SCADA programming scope for the existing tank site RTU and Master RTU at the District's office. The Work will be substantially complete on or before November 30, 2022, General Conditions on or before December 31, 2022
Award
Water / Sewer
$1,248,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2022
May 3, 2022
Hooper Ledge Rd, South Paris, ME
Related To This Project
South Paris, ME
Bid Date: Feb 03 2022
South Paris, ME
Bid Date: Mar 13 2024
South Paris, ME
--
South Paris, ME
--
South Paris, ME
Bid Date: Oct 31 2024
South Paris, ME
Bid Date: Oct 18 2024
South Paris, ME
Bid Date: Mar 01 2022
South Paris, ME
Bid Date: Jun 28 2023
South Paris, ME
Bid Date: Feb 16 2023
South Paris, ME
Bid Date: Mar 09 2018
South Paris, ME
Bid Date: Mar 16 2022
South Paris, ME
Bid Date: Dec 01 2022
Oakland, ME
Bid Date: Mar 17 2022
Bangor, ME
Bid Date: Mar 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.