Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 2, 2024 at 7:00 PM

Updated January 27, 2024

Site work and new construction of a fire / police facility in Boston, Massachusetts. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The scope of work is further detailed in the specifications, services for the new Engine 3 Fire Station Project includes, but is not limited to; assistance with land acquisition procedures, community outreach, programming, cost estimating, and design services through construction documents. All technical questions are to be submitted to PFD's Bid Counter by email at bid.info@boston.gov

Post-Bid

Fire / Police

$3,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
763
Active Projects
376
Bidding Soon
5,099
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 5, 2024

Project location map

618 Harrison Ave, Boston, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed