Site work and new construction of a water / sewer project in Bowling Green, Kentucky. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
**As of May 20, 2022, the project is on hold pending negotiations..** Project no- 1941 The work to be performed (Work) consists of the construction of the new odor control systems and ventilation at the headworks building. The project includes (but not limited to) the following: 1. Decommissioning, demolition, and removal of the existing odor control system. 2. Providing temporary odor control during construction if necessary. 3. Installing a new two-stage odor control systems furnished by Owner. 4. Decommissioning, demolition, and removal of the existing makeup air (MAU-1). 5. Installing two (2) new make-up air units for headworks building. 6. Modifying the electrical and instrumentation/control systems as necessary. 7. Complete additional associated work as identified in the bid documents. The Owner reserves the right to waive any informality or to reject any and all bids. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Contract Documents. The work to be performed (Work) consists of the construction of the new odor control systems and ventilation at the headworks building. The project includes (but not limited to) the following: 1. Decommissioning, demolition, and removal of the existing odor control system and appurtenances, including demolition of the existing concrete slab. 2. Providing temporary odor control during construction as requested by Owner if necessary. 3. Installing a new two-stage odor control system consisting of a bioscrubber and carbon adsorber furnished by Owner at the headworks including channels, screens, grit units and pump station wet wells. 4. Installing two (2) new GAC carbon scrubbing odor control systems at the headworks building furnished by Owner. 5. Decommissioning, demolition, and removal of the existing make-up air (MAU-1) and associated ductwork and appurtenances. 6. Installing two (2) new make-up air units for headworks building. 7. Modifying the electrical and instrumentation/control systems as necessary to accommodate the new odor control and ventilation systems. 8. Covering, sealing or otherwise eliminating or minimizing gaps and other openings in gratings and around isolation gates using methods as shown on the Drawing. 9. Replace covers for influent channels, screening channels, and grit units as shown on the Drawings. 10. Modifications to access drive paving to maintain access around the headwork building and new odor control systems placement. 11. Modifying headworks building bathroom to relocate interior door access to exterior wall
Final Planning
Water / Sewer
$800,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2022
November 20, 2022
1189 Preston Ave, Bowling Green, KY
Related To This Project
Bowling Green, KY
Bid Date: Nov 15 2022
Bowling Green, KY
Bid Date: Sep 16 2022
Bowling Green, KY
Bid Date: Sep 16 2022
Bowling Green, KY
Bid Date: Oct 26 2022
Bowling Green, KY
Bid Date: Nov 23 2022
Bowling Green, KY
Bid Date: Jul 18 2022
Bowling Green, KY
--
Bowling Green, KY
Bid Date: Nov 13 2022
Bowling Green, KY
Bid Date: Oct 26 2022
Bowling Green, KY
Bid Date: Oct 20 2022
Bowling Green, KY
Bid Date: Oct 18 2022
Bowling Green, KY
Bid Date: Oct 05 2022
Bowling Green, KY
Bid Date: Sep 15 2022
Bowling Green, KY
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.