Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Manchester, New Hampshire. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.
The City of Manchester, Department of Aviation (hereinafter "the Airport"), will accept Pre-qualification Statements from contractors interested in bidding on upcoming construction projects at Manchester-Boston Regional Airport during calendar year 2022. The projects for which Pre-qualification Statements are being accepted are described below. Project descriptions are representative of the types of projects the Airport is considering at this time and/or other similar projects that may be initiated during this construction season. Contractors who qualify for specific projects shall be considered qualified for any projects the Airport deems to be similar in nature. Rehabilitate Runway 17-35 Pre-Qualification Statement Submittal Date: March 4, 2022 This project consists of 226,000 square yards of pavement milling of the existing bituminous runway, shoulder, and blast pads. 46,000 tons of bituminous material will be installed as an overlay. 330,000 square feet of pavement markings as well as 142,000 square yards of pavement grooving will be required. Airfield electrical will include replacement of 690 lights, replacement of 38 airfield signs and 45,000 feet of electrical cable serving Runway 17-35. 161 of the FAA's in-pavement approach lights will be replaced or adjusted. In addition to the runway, the project includes rehabilitation of the Taxiway Alpha Mechanical Stabilized Earth (MSE) retaining wall. 250 MSE wall panels will be removed and reinstalled to accommodate 900 feet of new drainage piping and 6 new drainage structures installed behind the MSE wall. The approximate project cost range of the combined runway and retaining wall project is between $13,000,000 and $15,500,000. Contract requirements related to Federal funding may apply. Contractors may apply for pre-qualification for any one or more of these projects. Only pre-qualified contractors will be afforded the opportunity to bid on Airport projects requiring pre-qualification. Product/Material suppliers and subcontractors are not required to file for pre-qualification. The Airport may accept or reject, at its sole discretion, any Pre-qualification Statements received which are incomplete or lack sufficient detail for consideration. Individual projects will not be re-advertised if they are adequately represented in this legal notice. It is the sole responsibility of the Contractor to be prequalified within the timeframe stated above. Pre-qualified contractors will be notified of all projects for which they have been pre-qualified to bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Transportation Terminals
$15,500,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2022
May 4, 2022
1 Airport Rd, Manchester, NH
Related To This Project
Manchester, NH
Bid Date: Nov 14 2022
Manchester, NH
--
Manchester, NH
Bid Date: Feb 27 2020
Manchester, NH
--
Manchester, NH
Bid Date: Aug 18 2021
Manchester, NH
Bid Date: May 01 2019
Manchester, NH
Bid Date: Feb 27 2020
Manchester, NH
Bid Date: Jul 01 2024
Manchester, NH
Bid Date: Mar 04 2022
Manchester, NH
Bid Date: Apr 16 2021
Manchester, NH
Bid Date: Mar 04 2022
Manchester, NH
--
Manchester, NH
Bid Date: Jun 25 2020
Manchester, NH
Bid Date: May 06 2022
Manchester, NH
Bid Date: Apr 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.