Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a service station / car wash facility in East Fayetteville, North Carolina. Completed plans call for the renovation of a service station / car wash facility.
A) Mechanically Attached TPO (Section 1 & Section 2) Perform a pre-construction meeting to determine the staging area for equipment and the loading of roof, appropriate work hours, safety and production projections. 1. Set up equipment, materials, safety lines at all roof perimeters and ground loading/dumpster areas. 2. Furnish and install RetroFit drain on Section 1. 3. The existing gutters and downspouts are to be reused in the new roof system. 4. Remove the existing roof system down to roof deck. Inspect the existing roof decking and repair all areas damaged at an additional unit price per square foot. 5. Furnish and install 2x6 wood nailer around the perimeter of building to match the new insulation height. 6. Furnish and install 2 layers of 2.6" polyisocyanurate insulation system mechanically attached to the roof deck to the manufacturer's specifications and details. With a R-Value of 30. 7. Install a new 060 mil TPO mechanically attached membrane system in accordance with manufacturer's specifications and details. 8. Install associated penetration, curb flashings, and perimeter flashings as required by the manufacturer. 9. Fabricate and install new 24-guage prefinished gravel stop on all non-draining perimeter edges. 10. Custom fabricate and install new TPO clad steel drip edge at guttered perimeters. 11. Provide a manufacturer's 20-year labor and materials warranty. 12. Provide a 2-year contractor's warranty against defects in workmanship. B) Mechanically Attached TPO RetroFit (Section3) Perform a pre-construction meeting to determine the staging area for equipment and the loading of roof, appropriate work hours, safety and production projections. 1. Set up equipment, materials, safety lines at all roof perimeters and ground loading/dumpster areas. 2. The existing gutters and downspouts are to be reused in the new roof system. 3. install pre-cut EPS flute filler insulation between the metal panel ribs and internal gutter followed by 2 layers of 2.6" polyisocyanurate insulation cover board on roof area. New insulation to be mechanically fastened as per manufacturer guidelines with an R-Value of 30. 4. Install wood nailers around all outside perimeters of the roof sections to match the new insulation height. 5. Install a new 60 mil TPO single ply mechanically fastened membrane through the structural purlins as per manufacturer specifications. 6. Flash all roof penetrations and perimeters according to manufacturer's standard details. 7. Fabricate and install new 24-guage prefinished gravel stop on all non-draining perimeter edges. 8. Custom fabricate and install new TPO clad steel drip edge at all draining gutter edge perimeters. 9. All Kynar colors to be selected by the owner from a supplied color chart. 10. Provide a 2-year contractors warranty against defects in workmanship. 11. Provide a manufacturer's 20-year labor and material warranty upon completion and inspection of the new roofing system by an authorized manufacturer's representative. C) Mechanically Fastened TPO (Section 4) Perform a pre-construction meeting to determine the staging area for equipment and the loading of roof, appropriate work hours, safety and production projections. 1. Set up equipment, materials, safety lines at all roof perimeters and ground loading/dumpster areas. 2. The existing gutters and downspouts are to be reused in the new roof system. 3. Remove the existing roof system down to the roof deck, inspect existing roof decking and repair all areas damaged at an additional unit price per square foot. The period of performance will be 90 days and shall commence upon the issuance of the purchase order.
Post-Bid
Service Station / Car Wash
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2022
March 24, 2022
539 Bragg Blvd, East Fayetteville, NC
Related To This Project
East Fayetteville, NC
Bid Date: Feb 25 2022
East Fayetteville, NC
Bid Date: Mar 17 2022
East Fayetteville, NC
Bid Date: Mar 08 2022
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Jun 29 2021
East Fayetteville, NC
Bid Date: Jan 20 2022
East Fayetteville, NC
Bid Date: Sep 28 2023
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Feb 25 2022
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Feb 09 2022
East Fayetteville, NC
Bid Date: Feb 10 2022
East Fayetteville, NC
Bid Date: Feb 15 2022
East Fayetteville, NC
Bid Date: Feb 23 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.