Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Earlville, Illinois. Completed plans call for site work for a bridge / tunnel.
This project is located at three structures in LaSalle County. Structure No. 050-0-166 carrying N36th Rd. over I-39, 1.0 mile South of US 34. Structure No. 050-0172 carrying N42nd Rd. over I-39, 1.0 mile South of US 52. Stucture No. 050-0218 carrying IL 351/71 over the Lone Star Cement Co. Railroad. 2.6 miles South of US 6 (in Oglesby). This project consists of cleaning and painting all structural steel and other steel components of the structures. Region 2 District 3 Federal Project # N/A County(s) LaSalle Key Route(s) FAI 39, FAP 619 Marked Route(s) I-39, IL 351 Section(s) (50-6HB,50-7HB-1,70VBR)BP State Job #(s) C-93-040-22 PPS #(s) 0-01375-3004 Completion Date: 30 Working Days Questions not accepted as of March 01, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 18, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. Pursuant to the Rules for Prequalification of Contractors and Issuance of Plans and Proposals, 44 Illinois Administrative Code 650.70,... "This contract requires, in addition to the normal IDOT prequalifications requirements, that the Contractor be SSPC - QP1 and QP2 certified. Evidence of certification must be provided prior to receiving authorization to bid." Contractors are required to submit copies of current certificates for each Letting. These certificates must be submitted along with the contractor's original BC 57 Affidavit of Availability. (BC 57) ILDOT - 109 - Cleaning and Painting All Structural Steel and Other Steel Components of the Structures
Award
Bridges / Tunnels
$511,038.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2022
April 11, 2022
Multiple Locations, Earlville, IL
Related To This Project
Earlville, IL
Bid Date: Oct 27 2023
Earlville, IL
Bid Date: Feb 15 2024
Earlville, IL
Bid Date: Mar 08 2024
Earlville, IL
Bid Date: Feb 21 2024
Earlville, IL
Bid Date: Mar 01 2024
Earlville, IL
Bid Date: Apr 26 2024
Earlville, IL
Bid Date: May 15 2024
Earlville, IL
Bid Date: Jun 14 2024
Earlville, IL
Bid Date: Feb 15 2022
Earlville, IL
Bid Date: Mar 04 2022
Earlville, IL
Bid Date: Nov 05 2021
Earlville, IL
Bid Date: May 17 2023
Earlville, IL
Bid Date: Apr 27 2023
Earlville, IL
Bid Date: Feb 14 2023
Earlville, IL
Bid Date: Feb 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.