BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 16, 2022 at 8:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in Whiting, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project consists of the installation of water main and appurtenances; roadway, sidewalk, driveway, and curb repair; and minor sewer work. Proposals shall be properly and completely executed on the Bid Form provided in the Bidding Documents and must be accompanied by an executed Indiana State Board of Accounts Form 96, confirmation that copies of Addenda were received (if issued), satisfactory bid security, and other items as requested in the Bidding Documents. A certified or cashier's check payable to the City of Whiting or a bid bond in an amount equal to five (5) percent of the bid amount must accompany each bid. All checks from unsuccessful bidders will be returned to them by the City upon selection of the successful bidder. The successful Bidder will be required to provide both a Performance and Payment Bond each portion in the amount of one hundred (100) percent of the Contract amount. Bidders must be experienced in the construction of the type of facilities to be built under the Contract(s) for which a bid is submitted. Bidders and their subcontractors shall be INDOT prequalified to perform the work specified in these contract documents. Pursuant to Indiana Code 22-5-1.7-11, the Contractor entering into a contract with the City of Whiting is required to enroll in and verify the work eligibility status of all of its newly hired employees through the E-Verify program. The Contractor is not required to verify the work eligibility status of all its newly hired employees through the E-Verify program if the E-Verify program no longer exists. Pursuant to Indiana Code 5-22-16.5 the City of Whiting may not contract with a person who is engaged in investment activities in Iran. In determining the lowest responsible and most responsive bidder, the Owner will consider the Total Base Bid and/or any combinations of the total base bid and/or alternate bids made for the Contract. The Owner may also consider all other relevant facts mentioned in the Project Documents or which the Owner may legally consider. The City reserves the right to reject any and all bids or to waive any informalities in the bidding, should the City deem it to be in the public interest to do so. Authorized and published by the authority of the City of Whiting, Indiana acting by and through its Board of Public Works & Safety.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
293
Bidding Soon
3,102
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 29, 2022

Project location map

119th St, Whiting, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.