BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Indianapolis, Indiana. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

A&W Project No.: 20IN0545 The collection system proposed project will include a new regional lift station with four (4) pumps, mechanical fine screen with manual trash rack bypass, and a new generator. The new 4.0 MGD wastewater treatment plant proposed project will include the following: four (4) aeration basins, two (2) secondary clarifiers, chemical phosphorus removal facilities ultraviolet light (UV) disinfection, diffused air post-aeration, and new effluent piping and associated outfall structure. The WWTP will also have an influent electromagnetic flow meter and effluent ultrasonic flow meter, two (2) aerobic digesters, and a screw press. Bids from contractors who are not Plan Holders of Record will be rejected as non-responsive. The work to be performed and the proposal to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. Bids shall be submitted in a sealed envelope marked: BID FOR: BEN DAVIS CONSERVANCY DISTRICT WASTEWATER TREATMENT PLANT Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder. All bids must be submitted on the bid forms as identified in the Contract Documents and Specifications. No bid will be considered unless submitted on the printed Proposal Form found in the project manual. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least 90 days to allow review of proposals before announcing award of contract. Each proposal shall be accompanied by a bid guaranty conforming to the Indiana Revised code. Said bid guaranty shall be a certified check in an amount equal to five percent (5%) of the BID; or, a bond for five percent (5%) of the BID as surety for the execution of the contract. The bid bond or certified check should be made out to the OWNER. The bid bond form is included in the bidding documents. Should any BID be rejected, such certified check or bond shall be forthwith returned to the BIDDER, and should any BID be accepted, such certified check or bond will be returned upon the proper execution and securing of the contract. When the contract is executed, the certified check or bid bond of all unsuccessful BIDDERS will be returned. Proposals shall be properly and completely executed on proposal forms included in the Specifications. Proposals shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. A copy of the proposed Financial Statement to be submitted with the bid is included in the bid proposal documents section to these specifications. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. The contractor to whom the work is awarded will be required to furnish, before commencing work, a performance, maintenance and payment bond in an amount equal to the bid price of the contract awarded to said contractor, and certificates of all insurance required in the specifications. All bonds and liability insurance shall remain in effect for a period of twelve (12) months following completion and acceptance of construction. The award of the contract is subject to all approvals required by local agencies. Upon securing of all approvals, the successful bidder shall receive a Notice to Proceed with construction and said contractor shall begin construction within ten (10) days of receipt of such notice, and shall complete the project pursuant to the contract documents. Each bidder is responsible for inspecting the Project Site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to the Bid. A conditional or qualified Bid will not be accepted. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the project throughout. Award will be made to the low, responsive, responsible bidder. The Ben Davis Conservancy District reserves the right to reject any proposal or all proposals, or to accept any proposal or proposals, or to make such combination of proposal as may seem desirable, and to waive any and all informalities in the bidding.

Post-Bid

Water / Sewer

$600,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
33
Bidding Soon
757
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

April 18, 2022

img_map_placeholder

703 S Tibbs Ave, Indianapolis, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.