Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2022 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Redlands, California. Contact the soliciting agency for additional information.
Review the Citys current Solid Waste rate projections and financial planning for purposes of understanding the potential incurred costs associated with state mandates, for the purpose and reasonableness of Operating and other Reserve Fund Balances Calculate the Solid Waste fees and user charges required to adequately recover the costs of providing solid waste and recycling services and collection of organic waste Identify alternative rate structure or modifications to the Citys existing solid waste and recycling rates designed to improve and meet City objectives Recommendations for an updated financial plan that forecasts the need of rate adjustments (if recommended) Draft and final reports that document the current process used in development of the Solid Waste Rate Structure and modifications and/or recommendations for review Revise recommendations as needed after receiving City input Recommendations for the demands of the operating and infrastructure costs associated with SB 1383 or other related legislation Evaluation of the alternatives to the existing rate structure to encourage recycling while being in compliance with Proposition 218 Draft a Proposition 218 Notice reflecting the Citys proposed rate adjustments, if any, and make any adjustment to that notice based on the Citys comments Survey of surrounding jurisdictions within a 30 mile radius to compare rates Consultant should be able to complete study within 90 days following approval TERMS AND CONDITIONS By submitting a bid, vendors acknowledge conformity with all of the bid notices and attached and written Terms and Conditions such as, but not limited to, insurance, business license, applicable labor codes and laws. Online Q&A: Yes Q&A Deadline: 03/24/2022 2:00 PM (PDT) Pre-Bid Meeting: No Bid Bond: 0.00% Payment Bond: 0.00% Performance Bond: 0.00% Project Duration: 90 Days The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2023
Multiple Locations, Redlands, CA
Related To This Project
Redlands, CA
Bid Date: Mar 16 2022
Redlands, CA
Bid Date: Mar 16 2022
Redlands, CA
Bid Date: Mar 15 2022
Redlands, CA
Bid Date: Mar 15 2022
Redlands, CA
Bid Date: Mar 15 2022
Redlands, CA
Bid Date: Mar 15 2022
Redlands, CA
Bid Date: Mar 15 2022
Redlands, CA
--
Redlands, CA
Bid Date: Feb 28 2022
Redlands, CA
Bid Date: Feb 17 2022
Redlands, CA
--
Redlands, CA
Bid Date: Feb 23 2022
Redlands, CA
Bid Date: Jan 27 2022
Redlands, CA
Bid Date: Dec 15 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
