BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Hutchinson, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a transportation facility; transportation facility; water / sewer project; and transportation facility.

As of April 19, 2023, the project is pending award. A timeline for award has not been confirmed. Construction of a new 8,000 SF Hangar for the Minnesota Civil Air Patrol, including pavement and curb and gutter for parking, new site utilities, and related mechanical, electrical, and technology work for the hangar building at the Hutchinson Municipal Airport. The project also includes a new asphalt taxi-way connection and concrete pavement aircraft apron and aircraft tie-downs. The work, in accordance with drawings and specifications prepared by TKDA in Saint Paul, Minnesota, consists of the following major items of work: 1 LS Hangar Building, 735 TN Plant-Mixed Asphalt Pavement, 1,111 SY Concrete Pavement, 4,400 SY Aggregate Base, 1,100 CY Granular, 213 LF Concrete Curb & Gutter, 18,650 CY Excavation, 496 LF Watermain, 491 LF Sanitary Sewer, and 205 LF Storm Sewer

Bid Results

Transportation Terminals

$2,371,967.00

Public - State/Provincial

New Construction, Paving, Site Work

60

28

28

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
705
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

April 7, 2022

img_map_placeholder

1700 Butler Field Dr, Hutchinson, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.