BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Milwaukee, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

CITY OF MILWAUKEE SPECIFIC OFFICIAL NOTICE NO. 4-1-2022 CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA R E Q U I R E M E N T S , CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5" CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7" CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEM EN T, VAR I OUS CONCRETE REMOVALS, SEWER WORK, APPURTENANCE UNDER- GROUND WORK, ETC.; Located at: ST216210111 - ADA RAMPS FOR 2022 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTH SIDE PROJECTS) The scope of this contract is to remove and replace all of the pedestrian ramps within the limits of each of the City of Milwaukee High Impact asphalt paving projects. The High Impact asphalt paving projects are as follows: O.N. # 6-1-2022 North 56th Street West Hampton Avenue to West Villard Avenue North 66th Street - West Port Avenue to West Bradley Road North 70th Street - West Congress Street to West Hampton Avenue North 80th Street - West Center Street to West Burleigh Stree North 82nd Street - West Center Street to West Burleigh Street North 95th Street - West Silver Spring Drive to West Carmen Avenue North 104th Street - West Grantosa Drive to West Congress Street West Appleton Lane - West Florist Avenue to North 115th Street West Port Avenue - North 60th Street to North 66th Street O.N. # 7-1-2022 North 7th Street - North Doctor Martin Luther King Junior Drive to West Capitol Drive North 13th Street - A point south of West Vine Street to West Brown Street North 32nd Street - West Atkinson Avenue to West Cameron Avenue North 47th Street - West Vliet Street to West Lloyd Street North 51st Street - West Lisbon Avenue to West Center Street North Hopkins Street - West Villard Avenue to North Sherman Boulevard West Locust Street - West Appleton Avenue to West Lisbon Avenue West Melvina Street - North 46th Street to West Leon Trail Time for Completion: All work on this contract shall be completed by August 31, 2022. Liquidated Damages, per diem: $500.00/Day The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusions (OEI) website. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. The apprenticeship requirements for this project are: 0%. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. THE EMAILED COPY OF THE BOND MUST BE RECEIVED BY NO LATER THAN 10:30 A.M. ON THE SAME DATE THAT THE BIDS ARE DUE FOR THAT SPECIFIC OFFICIAL NOTICE, or the bid will be considered non-responsive. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder. IMPORTANT NOTICE: All bid documents for the listed project(s) are available electronically at www.city.milwaukee.gov/dpwbids and at www.bidexpress.com and can be submitted using either Bid Express or by emailing PDF copies of the complete bid documents to DPWbids@milwaukee.gov before 10:30 am on the date of the bid opening. However, Bidders are strongly encouraged to utilize www.bidexpress.com for submitting bids. Electronic documents can be obtained via http://mpw.milwaukee.gov/bids/ docs/4-2022. Any required addenda or response related to listed projects will be posted on both the DPW and Bid Express websites. Call 414-286-3314 to have your companys name and contact information added to the plan holder's list. PAYMENT MONITORING REQUIREMENTS: All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukees B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the Citys contract compliance software. Please contact the Office of Equity and Inclusion (OEI) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. PAYROLL MONITORING REQUIREMENTS: The Prime Contractor awarded this project is required to participate in training on the City of Milwaukees LCP Tracker Labor Compliance Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCP Tracker. Please contact the DPW Contracts Office at 414-286-3314 should you have any questions or concerns regarding the training or reporting process. Contractor must comply with all provisions of the CITY OF MILWAUKEE GENERAL OFFICIAL NOTICE TO CONTRACTORS published herein and at Website.

Post-Bid

Sidewalks / Parking Lot

$511,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
99
Bidding Soon
2,395
All Active Projects
882
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2022

March 25, 2022

August 31, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.